|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- REPLACEMENT AND REMOVAL OF UNDER GROUND STORAGE TANKS
- REPLACEMENT AND REMOVAL OF UNDER GROUND STORAGE TANKS
- SABER
- SABER
- REPLACE STEAM AND CONDENSATE LINES
- REPAIR HVAC AT BUILDING 202
- RENOVATE EYSTER AQUATIC CENTER, BUILDING 6940, FORT
- PY'95 REPLACE ELECTRIC PANELS IN BUILDING NO.12 AND
- ELEVATOR/HANDICAP REMODEL, ASTORIA MAIN POST OFFICE,
- REPAIR OF THE ELEVATOR IN BUILDING F-6
- HANDICAPPED ACCESSIBLE WASHROOMS
- RENOVATE FAMILY HOUSING/CONSTRUCT PLAYGROUNDS AND TOT
- BLDG. 134, UPGRADE A/C SYSTEM
- REPAIRS & ALTERATIONS, MAIN POST OFFICE, WABASH, IN
- RENOVATE BUILDING 1164 HVAC FOR CONFERENCE CENTER
- PROVIDE AND INSTALL WET PIPE SUPPRESSION AND FIRE
- LIGHTNING PROTECTION SYSTEM
- REPAIR SEAWALL, LAKE PIPPIN, EGLIN AFB, FL
- 3RD & 4TH FLOOR RENOVATION
- HVAC IMPROVEMENTS, MAIN POST OFFICE, MISHAWAKA, IN
- PIER 2 OW/WO COLLECTION SYSTEM & BOWTS SITE, PREP &
- IMPROVE PASSENGER ELEVATORS
- BUILDING 14, WASH AREA
- REPLACE SWITCHBOARD, BUILDING 1817
- CORRECT IRM/PROSTHETIC DEFICIENCIES
- ROADSIDE BRUSHING, SHOAL COVE, KETCHIKAN AREA, TONGASS
- RENOVATIONS TO BUILDINGS, INCLUDING MECHANICAL AND
- REPAIR COMMUNICATION CABLES
- ROADSIDE BRUSHING, PRINCE OF WALES ISLAND, KETCHIKAN
- CONSTRUCT TWO PARKING LOTS EAST AND WEST OF BUILDING
- EROSION CONTROL
- REMOVE EXISITING AND INSTALL NEW FIRE ALARM SYSTEMS IN
- COMPLETE CONSTRUCTION OF PHASE ONE OF A ONE STORY WORK
- PERIMETER SECURITY UPGRADE
- Z-RENOVATE B86 FOR INTERMEDIATE CARE
- APPLICATION OF EPOXY FLOORING, 8840 SQ. FT.
- JFK CHILD CARE CENTER
- LEAD ABATEMENT AND PAINT BLDG. 14
- IDQ SECURITY SYSTEM INSTALLATION
- REMOVE STEEL, LEAD-BASE PAINT COATED PLAYGROUND
- REPAIR AND MAINTAIN STATIONARY OUTDOOR WOODEN BENCH
- PAINT INTERIOR OF RESERVE CENTER
- PROVIDE AND INSTALL EXHAUST SYSTEM, BLDG 170,176, AND
- RESTRIPE VARIOUS ROADS AND CROSSWALKS AT THE NAVAL AIR
- STEAM MANHOLE PIPING INSULATION
- REPLACE ELECTRICAL DISTRIBUTION SYSTEM, MARINE CORPS
- EXTERIOR BUILDING MAINTENANCE
- PAVE THEATER AND CANTEEN ROADS
Today's CBD Index Page
Created on September 21, 1996 by Loren Data Corp. --
info@ld.com
|
|
|