|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- SEALING OF VARIOUS SANITARY SEWER MANHOLES
- PLUMBING AND NEW SLAB FOR WASH AREA AT MAINTENANCE
- CONSTRUCT MI WORK/STORAGE AREA
- MARKET SURVEY, JOB ORDER CONTRACTS, SEARCH FOR SMALL
- MEDICAL GAS SYSTEMS UPGRADE
- REROOF BUILDINGS 145 SOUTH
- INSTALL FIRE ALARM TRANSMITTERS AND FIRE ALARM CONTROL
- ROOFING REQUIREMENTS
- REPLACE ROOF, BUILDING 1780
- ROADS AND DRAINAGE REQUIREMENTS IDQ, FORT POLK,
- ELECTRICAL UPGRADE AND LIGHTING REPLACEMENT, 3
- RENOVATE AIRCRAFT MAINTENANCE FACILITY, PHASE II,
- EXPAND FITNESS CENTER, BLDG 103, NAS, CORPUS CHRISTI,
- PARKING LOT EXPANSION, PRESQUE ISLE BR., ERIE PA
- GROUSE CREEK ORCHARD FENCE
- REPLACE ROOFING
- REPLACE HEAT PUMPS, VARIOUS HOUSING AREAS, MARINE
- STEAM DISTRIBUTION REPAIRS
- DEMOLISH BUILDING 75
- FREEPORT HARBOR, TEXAS, DREDGING ENTRANCE AND JETTY
- INSTALL AIRFIELD FENCING, DUKE FIELD (FIELD #3), EGLIN
- CORRECT OUTPATIENT DEFICIENCIES (NEW CANTEEN/CREDIT
- PAINT EXTERIOR WHERRY HOUSING
- REPLACE UNDERGROUND FUEL TANKS AT BUILDING 428 AND
- LIFE SAFETY COMPLIANCE OF BLDG 2792, FORT SAM HOUSTON,
- CHAIR RAILS AND DOORS AT YUMA AREA OFFICE
- AMBULATORY SURGERY CENTER
- RPL SWITHCHGEAR SUBSTATION 2
- REROOF HOUSING AREAS 22 & 23 AND 5202 MARNE COURT,
- IRON CREEK BRIDGE
- REROOF MODULAR BUILDING AT SANTA TERESA STATION, SANTA
- REROOF VARIOUS BUILDINGS, PHASE 1
- EXPAND COOLING TOWER/RETROFIT
- SMOKE BARRIER WALL RESTORATION-B57
- CORRECT SAFETY DEFICIENCIES
- AMBULATORY CARE PHASE 1
- PRIEST LAKE INFORMATION CENTER (PLIC)
- SP:CR23-95, MARGINAL WHARF OILY WASTE SYSTEM, TRIDENT
- RESTORATION OF FIRE DAMAGED HOUSE, 4613B IRONWOOD,
- REPLACE ROOF, JOHN N. REESE JR. USARC, TULSA, OK
- INSTALL 10-TON HEAT PUMP, BUILDING 33 AT NAWS, POINT
- STREAMBANK EROSION PROTECTION, HIGHWAY 17, DES MOINES
- INSTALL TWO SEWAGE GRINDERS, 14 AREA AND 22 AREA, AT
- SPRINKLER SYSTEM REVISIONS-B57
- RENOVATE TRANSIENT LODGING FACILITY, BUILDING P-80,
- INSTALLATION OF PERIMETER FENCE
- JORSTED ROAD, HOOD CANAL RANGER DISTRICT, MASON
- REPLACEMENT OF ROOF AND PARAPET WALLS- MOTT HAVEN VI
- UPGRADE HVAC BUILDING 6
- RENOVATIONS TO MAIN LOBBY AND VISITORS AREA, BUILDING
- REPLACE WINDOW PANELS AT BUILDING 198 AT THE NSWC,
- CONSTRUCT OBSERVATION TOWER AT RANGER 28
- GROUND WATER REMEDIATION
- WATERPROOF BUILDING 8
- INSTALLATION OF EMERGENCY GENERATOR
- REMOVE THREE ABOVE GROUND STORAGE TANKS.
- PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND PERFORM
- FAMILY HOUSING REVITALIZATION FOR CASCAJO POINT
- RENOVATE SHRUBEDS MIRAMAR HOUSING MIRAMAR CORPS AIR
- REPLACE HVAC UNIT, VKF HOTSHOT BUILDING
- MAINTAIN/REPAIR BUILT-UP ROOFS INDEFINITE DELIVERY
- RENOVATIONS TO BUILDING 10, PHASE II, LETTERKENNY ARMY
- MISCELLANEOUS FIRE SAFETY DEFICIENCIES-B57
- REMOVE LEAD PAINT
- 7E MULTI-PURPOSE ROOM
- MODIFY KITCHEN RANGE CABINETS
- WIEBE TRAIL RESTORATION
- MAINTAIN BASE ROADS, PHASE II & III
- REPAIR SEWER SYSTEM NAVAL SUBMARINE BASE SAN DIEGO
- ASBESTOS REMOVAL -B2
- SYNOPSIS NOTICE, REPLACE(DECENTRALIZE) CENTRAL PLANT
- REPAIRS TO BUILDINGS 9001 AND 9002 AND BREEZEWAY, FORT
- LIFE SAFETY CODE COMPLIANCE OF BLDG 2792, FORT SAM
- DESIGN/BUILD HVAC SYSTEM, BUILDING 8
Today's CBD Index Page
Created on July 30, 1998 by Loren Data Corp. --
info@ld.com
|
|
|