- ROOF REPLACEMENT, BUILDINGS 12 & 75 AT CENTERVILLE
- FY97 MCON PROJECT P-706 CHANNEL DREDGING, NAVAL AIR
- REPAIR/MAINTAIN DORM FACILITIES
- REBUILD RANGE TOWERS OUTERBRIDGE REACH, WOODBRDGE, NJ
- REPAIR BOILER FAC 34019
- REPAIR/REPLACE ARFLD LIGHTING CABLE
- INSTALL NEW ROOF AT USCG STATION SHINNECOCK, HAMPTON,
- CHILLER REPLACEMENT, LANCASTER, PA, P&DC FACILITY,
- LITTLE ROCK, AR 72231-9998 - GENERAL MAIL FACILITY,
- REPAIR STAINED GLASS WINDOWS, UNITED STATES NAVAL
- RENOVATION OF BUILDING 2750, FORT EUSTIS, VIRGINIA
- BLOCK 39000 UTILITY UPGRADE, FORT HOOD, TEXAS
- SOLICITATION NOTICE-AIR CONDITIONING SYSTEM ELEMENTARY
- RENOVATIONS OF ALL-PURPOSE BUILDING AT U.S. COAST
- RENOVATE BATTERY SHOP, BUILDING 7264
- CLOSED LOOP VEHICLE WASHRACK
- CONSTRUCT DOCK/RAMP & MISC, BUILDING 303 AT THE CRANE
- REPLACEMENT OF ROOF
- REPAIR BASE OPERATIONS, BLDG. 501 AT DOVER AFB DE
- REPLACE ROOFS ON BUILDING 479 AND 480 AT THE CRANE
- CATCH BASINS
- REPLACEMENT OF OVERHEAD POLES, CROSSARMS AND
- INDEFINITE QUANTITY MULTI-TRADES FY 97
- PAINTING OF TWO (2) WATER TOWERS, FORT INDIANTOWN GAP,
- ACCESS CONTROL SYSTEM UPGRADE, CLOCK TOWER BUILDING
- CONSTRUCT OFFICE AND TRAINING ROOM BLDG 322 AT THE
- REPLACEMENT OF STAGE CURTAINS BUILDING 1173
- INSTALL BITUMINOUS PAVING
- REMOVING & REPLACING STEEL BEAMS
- REPAIR DUCK POND DAM, EGLIN AFB FL
- REPAIR SALT FOG CHAMBER DOOR, BUILDING 450, EGLIN AFB
- REHABILITATE BOQ'S.
- REPAIR FIRE STATION BLDG. 85, INDIAN SPRINGS, NEVADA
- CONSTRUCT SEDIMENT CONTROL BASINS
- CONSTRUCT NATURAL RESOURCES COMPLEX SAN CLEMENTE
- STRUCTURAL REPAIRS TO PIER 11 NAVAL STATION SAN DIEGO
- INSTALL FIRE ALARM SYSTEM BLDG 532-538, 638-640, NAS
- UPGRADE DIRECT DIGITAL CONTROL (DDC) SYSTEM
- RENOVATE HI-BAY AREA, INSULATE, INSTALL HVAC SYSTEM.
- REHABILITATE TANK TRAIL.
- INSTALL FLOOR TILE IN BARRACKS
- DEMOLITION OF FIVE (5) BUILDINGS AT TRAVIS AIR FORCE
- REPAIR AIRFIELD PAVEMENT, NAS, CECIL FIELD, FLORIDA
- MWRA IMPROVEMENTS
- INSTALL FIBER OPTIC CIRCUITS BETWEEN BUILDING 104 AND
- REQUIREMENTS-TYPE TIME AND MATERIAL CONTRACT TO
- REMOVEL OF SUSPENDED CEILING GRID AND INSTALL NEW
- ELEVATOR MODERNIZATION, SAN ANGELO, TX
- CROSS CONNECTION PROTECTION, PHASE III, PR NO. 76-92,
- INSTALL SHEET PILE SEAWALL, BUILDING 700, EGLIN AFB FL
- CONSTRUCT PEST CONTROL MANAGEMENT FACILITY
- REPLACE HVAC SYSTEM, BUILDING 248, MARINE CORPS AIR
- CONSTRUCT PEST CONTROL MANAGEMENT FACILITY
- UPGRADE SHIELDS PARK MURPHY CANYON HOUSING SAN DIEGO
- ADD/ALTER/REPAIR BASE THEATER
- FURNISH AND INSTALL CHILLER AND COOLING TOWERS.
- UPGRADE OF 14 UNDERGROUND STORAGE TANKS (USTS) WITH
- ADAPT RANGE 43 FOR REMOTED TARGET SYSTEM (RETS), FORT
- BELL COUNTY EMERGENCY WATERSHED PROTECTION PROJECT,
- FLOYD COUNTY EMERGENCY WATERSHED PROTECTION PROJECT,
- REMEDIATE ZEBRA MUSSELS, BUILDING NO. 9, PR NO.
- FURNISH AND INSTALL FIRE SPRINKLER SYSTEM AT THE MINE
- REPAIRS TO EMERGENCY BULKHEAD, MONTGOMERY LOCKS AND
- REPAIR CONCRETE NEW SECTION, BUILDING NO. 160, PR NO.
- REPAIR OF COPING BLOCKS, BLDG. # 138 (PHASE 2 & 3)
- REPAIR UTILITIES, PINE SHADOWS MFH
- INSTALL SECURITY CAMERAS AT KENNELS, FORT DRUM, NEW
- HATCHIE RIVER CHANNEL RESTORATION, ALCORN AND TIPPAH
- ROOF REPLACEMENT
- ADD AN ADDITION TO BUILDING E-5103
- PROVIDE AND INSTALL BACKFLOW PREVENTORS AT VARIOUS
- REMOVE ASBESTOS CONTAINING MATERIAL IN VARIOUS
- REPAIR RODMAN AVENUE, WEST PHASE I, PR 75A-89, ROCK
- REPAIR EROSION NEAR RUNWAY, SAN NICOLAS ISLAND, FOR
- REPLACE WINDOWS AT ELEMENTARY SCHOOL
- REPAIR GROUNDING SYSTEM
- REPLACE HVAC EQUIPMENT, BUILDING 771 AT NSA MEMPHIS,
- MAJOR INTERIOR/EXTERIOR REPAIRS, BLDG. 1500, MCB, CAMP
- PLAYGROUND IMPROVEMENTS
- DRAINAGE INSTALLATION
- BOONE FORK WATERSHED, JACKHORN LAND TREATMENT SITE,
- BOONE FORK WATERSHED, MASTERS BRANCH LAND TREATMENT
- REPLACE CARPET, BUILDINGS 2602, 2604, 2609, 2611,
- RILEY PASS ROAD RECONSTRUCTION
- REPLACE FLOORING BLDG 6
- TEST CIRCUIT BREAKERS
- REPLACE MEDICAL AIR COMPRESSORS
- DIG, LOAD, HAUL, AND SPREAD CLAY GRAVEL ON FOREST
- INSTALL HVAC BLDGS 4 & 8
- CONVERSION OF EXISTING LODGE BUILDING TO NEW
- RENOVATION OF G.U. AMBULATORY CARE CLINIC
- REPLACE WHITE OAK TRESTLE, STELLA, NORTH CAROLINA
- MISCELLANEOUS ROAD REPAIRS, MCB, CAMP LEJEUNE, NORTH
- REPAIR RAILROAD, VARIOUS LOCATIONS, MCB, CAMP LEJEUNE,
- RECONSTRUCTION BALD RIDGE TRAIL NO. 645
- RECONSTRUCTION CENTER RIDGE TRAIL NO. 415
- REMOVAL AND CONSTRUCTION OF RANGE FENCES
- RESURFACE ROADWAYS
- REPAIR PAVEMENT, TELLICO RIVER ROAD NO. 210
- REPLACE CARPET BUILDINGS 2602, 2604, 2609, 2611, 2613,
- IMPROVE PEDESTRIAN SAFETY WOOKDLAKE HOUSING COMPLEX
- RENOVATE CHAPLAINS OFFICE AT MURPHY CANYON MILITARY
- SPACE ALTERATIONS
- ADDITION TO BUILDINS 97 & 101, NAVAL RESEARCH
- FLOOR COVERING REQUIREMENTS
- FIRE PROTECTION UPGRADE BLDG 1 AND 12 FLEET INDUSTRIAL
- TB REVISIONS