|
|
|
Z - Maintenance, Repair or Alteration of Real Property
SOLICITATIONS
- DESIGN BUILD PROJECT FOR THE REPLACEMENT OF EXISTING
- UPGRADE ELEVATORS 1, 2, 3
- UPGRADE ELEVATORS 1, 2, 3
- STRAITS OF MACKINAC, MI: RE-ROOF 3 OFF-SHORE
- SILVER CAMPGROUND COMPLEX MAINTENANCE
- REPOINTING OF EAST AND WEST WING'S MASONRY WALLS
- ASBESTOS REMOVAL AND BUILDING DEMOLITION FORT RILEY,
- VIRGINIA BEACH, VA REPLACE PERIMETER FENCING AT USCG
- REPLACEMENT OF RAISED FLOOR
- TASK ORDER CONTRACT (TOC)
- MAINTAIN/REPAIR AIRFIELD PAVEMENT, TRAVIS AIRFORCE
- PAINT EXTRERIOR, MFH
- REMOVAL AND DISPOSAL OF ASBESTOS (FRIABLE), INSULATION
- FREEZE PROTECTION MEASURES, USCG STATION BURLINGTON,
- REPAIR ROOF/EXTERIOR SUPPLY 175, BIRMINGHAM IAP (ANG),
- MAINTENANCE AND REPAIR TO FAMILY HOUSING AND RELATED
- RENOVATE RESEARCH BUILDING
- PRESOLICITATION NOTICE FOR REPAIR TO GALLEY HVAC,
- ESTABLISH FIXED ATON-DANGEROUS CAPE, PORT GRAHAM,
- REPAIR FIRE ALARM SYSTEM, BUILDING 36, SECTION A
- REPLACE HEATING, VENTILATION AND AIR CONDITIONING
- MAINTENANCE FOR HVAC AND VARIABLE AIR VOLUME EQUIPMENT
- TUCKPOINT BUILDING 22
- ROAD WORK AT DINOSAUR NATIONAL MONUMENT, UTAH
- REPAIR FIRE ALARM SYSTEMS, BUILDINGS 1,2,4,5,7,18,20,25
- DESIGN, BUILD AND INSTALL A NEW REPLACEMENT CHILLER
- SPOT REPAIR BY PRINTING THE BUFFALO BILL POWERPLANT
- PAVEMENTS IDIQ
- DIATHON ELASTOMERIC ROOF COATING
- 5KV CABLE REPLACEMENT
- REPAIR EXTERIOR BUILDING 25
- SITE RESTORATION AT MARATHON, TX
- ROOF REPAIR, PATUXENT WILDLIFE RESEARCH REFUGE, PRICNE
- INSTALL ENHANCED ELECTRICAL GROUNDING SYSTEM IN LAS
This Issue's Index
Today's CBD Index Page
Created on June 16, 2000 by Loren Data Corp. --
info@ld.com
|
|
|