COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 5, 2001 PSA #2951
SOLICITATIONS
Y -- CENTRAL UTILITY BUILDING (CUB) GENERAL CONSTRUCTION (GC)
- Notice Date
- October 3, 2001
- Contracting Office
- UT-Battelle,LLC, P.O. Box 2008, Oak Ridge, TN 37831-6192
- ZIP Code
- 37831-6192
- Solicitation Number
- F5-2681-01-RFP01-1039
- Point of Contact
- Ralph S. Helton, 865/241-7592, 865/574-3877 (Fax)
- E-Mail Address
- Click here to contact the Procurement Specialist via (heltonrs@sns.gov)
- Description
- 1. All inquiries relative to the contents of this Pre-Solicitation Notice are to be addressed to: Knight/Jacobs Spallation Neutron Source (SNS) Project Site, Bethel Valley Road, Mail Stop 6470, Trailer 801T, Room 12, Oak Ridge Tennessee 37830, Attention: Ralph S. Helton -- Telephone (865) 241- 7592, Facsimile (865) 574-3877. 2. All parties interested in receiving a formal solicitation for this construction project must be an approved and prequalified as a general contractor. The Knight/Jacobs vendor pre-qualification questionnaire can be obtained through the point of contact (POC) identified in Note 1 above. 3. The following information is applicable to all potential subcontractors: (a)Knight/Jacobs Joint Venture is the Architect Engineer and Construction Manager for the SNS Project. (b)UT-Battelle, LLC is the Management and Operations contractor of the Oak Ridge National Laboratory as prime contractor to the U.S. Department of Energy. (c)There are no classified security requirements associated with the construction of the SNS Project. (d)All construction subcontractors are required to become signatory to the SNS Project Labor Agreement (PLA). The PLA is only subject to work performed on the SNS Project. A copy of the PLA is available for review through the POC identified in Note 1 above. (e)All work is deemed "Green Field" construction and is not considered "inside the fence" of the DOE reservation. (f)The SNS Project Site is deemed a Drug Free Workplace and all successful subcontractors will be subject to a pre-site access alcohol and drug screening. (g)All successful subcontractors will possess an Interstate Experience Modification Rate (EMR) of 1.0 or less for the previous full three (3) year period. (h)The successful subcontractor will be required to furnish performance and payment bonds (i)The successful subcontractor will be required comply with the Office of Federal Contract Compliance Programs (OFCCP) goals for employment of protected classes of labor. (j)The successful subcontractor will be required meet or exceed Small Business Subcontracting Goals established under the subcontract. 4. The following is a brief description of the Central Utility Building General Construction (CUB GC) package: (a)Site work as detailed on Civil Drawings to include all excavation, backfilling, and compaction. (b)Provide and install waterproofing membrane. (c)Provide and install grounding system. (d)Supply and installation of miscellaneous metals (subcontract in place to provide and install structural steel). (e)Provide and install underground electrical systems to the low voltage side of the unit substations and make terminations. Substation pads are considered part of the building. (f)Provide and intall Conveying Systems (e.g., Monorail and Jib Crane). (g)Provide and install underground piping and utility systems (e.g., sewer, storm water and drains, tower water, chilled water, and hot water) to five feet outside of building lines. (h)Provide and install all Building Architectural Features. (i)Provide and install Building Mechanical Systems. (j)Provide and install Building Electrical Systems including associated unit substations. (k)Provide and install Mechanical and Electrical systems between the CUB and Cooling Tower. 5. The estimated value of the CUB GC scope of work is between $5-10M with a period of performance of 365 calendar after Notice to Proceed. 6. All comments are to be submitted in writing (e.g., letter, FAX, e-mail) to the POC identified in Note 1 above not later than October 12, 2001. Telephonic questions relative to the solicitation will not be addressed. 7. A Pre-solicitation Meeting shall be scheduled should enough interest be generated resulting from this notice.
- Record
- Loren Data Corp. 20011005/YSOL005.HTM (W-276 SN50Z850)
| Y - Construction of Structures and Facilities Index
|
Issue Index |
Created on October 3, 2001 by Loren Data Corp. --