COMMERCE BUSINESS DAILY ISSUE OF JULY 25, 2001 PSA #2900
SOLICITATIONS
16 -- GEARBOX ASSEMBLIES, BALLSCREW / JACKSCREW ASSEMBLIES, AND POSITION COMPUTER ALL APPLICABLE TO THE C-5 AIRCRAFT FLAP SYSTEM.
- Notice Date
- July 23, 2001
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, WR-ALC, WR-ALC/PK Acquisition Opportunities 235 Byron Street, Robins AFB, GA, 31098-1611
- ZIP Code
- 31098-1611
- Solicitation Number
- F09603-01-R-35166
- Response Due
- September 12, 2001
- Point of Contact
- Josephus (Joey) Walker III, Contracting Officer, Phone (478)926-7360, Fax (478)926-7649, Email Joey.Walker@robins.af.mil
- Description
- Item 0001, NSN: 1680-00-230-6905UC, P/N: 5902-165D, Flap Gearbox Assembly. Dimensions: L16.875" W12.62? H7.063?, Weight 36lbs. Material: Steel / Aluminum. Function: Provides mechanical linkage to drive the flaps to extend and retract. Bid A (if first article is required) shall consist of items 0001AA, 0001AB, and 0002; as follows. 0001AA First Article requirement of 2 each, 1 of which will be unassembled and destroyed in testing. Required delivery for the first article is 180 days from contract award date. Government is allowed 60 days to test the first article. 0001AB Production quantity of 12 each. Required delivery 90 days after receipt of first article approval notification. 0002 First Article Test / Inspection Report data line item. Required delivery 180 days from contract award date. Government allowed 110 days to review the report. Bid B (if first article is not required) consists of only item 0001AC with a quantity of 13 each and required delivery of 90 days after contract award. =20 Item 0003, NSN: 1680-00-248-7638UC, P/N: 5901-115D, Flap Gearbox Assembly. Dimensions: L6" W9.5? H8.5?, Weight 13.65lbs. Material: Steel / Aluminum. Function: Provides linear movement to operate the trailing edge flap system through tubes and gears. Bid A (if first article is required) shall consist of items 0003AA, 0003AB, and 0004; as follows. 0003AA First Article requirement of 2 each, 1 of which will be unassembled and destroyed in testing. Required delivery for the first article is 180 days from contract award date. Government is allowed 60 days to test the first article. 0003AB Production quantity of 5 each. Required delivery 90 days after receipt of first article approval notification. 0004 First Article Test / Inspection Report data line item. Required delivery 180 days from contract award date. Government allowed 110 days to review the report. Bid B (if first article is not required) consists of only item 0003AC with a quantity of 6 each and required delivery of 90 days after contract award. =20 Item 0005, NSN: 1680-00-248-7639UC, P/N: 5901-114D, Flap Gearbox Assembly. Dimensions: L6" W9.5? H8.5?, Weight 13.65lbs. Material: Steel / Aluminum. Function: Provides direct power transmission to subsequent systems with a limited torque output to immediate components. Bid A (if first article is required) shall consist of items 0005AA, 0005AB, and 0006; as follows. 0005AA First Article requirement of 2 each, 1 of which will be unassembled and destroyed in testing. Required delivery for the first article is 180 days from contract award date. Government is allowed 60 days to test the first article. 0005AB Production quantity of 5 each. Required delivery 90 days after receipt of first article approval notification. 0006 First Article Test / Inspection Report data line item. Required delivery 180 days from contract award date. Government allowed 110 days to review the report. Bid B (if first article is not required) consists of only item 0005AC with a quantity of 6 each and required delivery of 90 days after contract award. Item 0007, NSN: 1680-01-161-2101UC, P/N: 5901-129F, Flap Ballscrew / Jackscrew Assembly. Dimensions: Overall Diameter 5.75? Ballscrew Diameter 1.5? L78.609?, Weight 26.62lbs. Material: Overall Steel. Function: Provides linear movement to operate the trailing edge flap system through tubes and gears. Bid A (if first article is required) shall consist of items 0007AA, 0007AB, and 0008; as follows. 0007AA First Article requirement of 2 each, 1 of which will be unassembled and destroyed in testing. Required delivery for the first article is 180 days from contract award date. Government is allowed 60 days to test the first article. 0007AB Production quantity of 32 each. Required delivery 90 days after receipt of first article approval notification. 0008 First Article Test / Inspection Report data line item. Required delivery 180 days from contract award date. Government allowed 110 days to review the report. Bid B (if first article is not required) consists of only item 0007AC with a quantity of 33 each and required delivery of 90 days after contract award. =20 Item 0009, NSN: 1680-01-161-2102UC, P/N: 5901-133E, Flap Ballscrew / Jackscrew Assembly. Dimensions: Overall Diameter 5.75? Ballscrew Diameter 1.1? L 58.957?, Weight 16.57lbs. Material: Overall Steel. Function: Provides linear movement to operate the trailing edge flap system through tubes and gears. Bid A (if first article is required) shall consist of items 0009AA, 0009AB, and 0010; as follows. 0009AA First Article requirement of 2 each, 1 of which will be unassembled and destroyed in testing. Required delivery for the first article is 180 days from contract award date. Government is allowed 60 days to test the first article. 0009AB Production quantity of 25 each. Required delivery 90 days after receipt of first article approval notification. 0010 First Article Test / Inspection Report data line item. Required delivery 180 days from contract award date. Government allowed 110 days to review the report. Bid B (if first article is not required) consists of only item 0009AC with a quantity of 26 each and required delivery of 90 days after contract award. Item 0011, NSN: 1680-01-162-5860UC, P/N: 5901-123F, Flap Ballscrew / Jackscrew Assembly. Dimensions: Overall Diameter 5.75? Ballscrew Diameter 1.5? L98.723?, Weight 45.23lbs. Material: Overall Steel. Function: Provides linear movement to operate the trailing edge flap system through tubes and gears. Bid A (if first article is required) shall consist of items 0011AA, 0011AB, and 0012; as follows. 0011AA First Article requirement of 2 each, 1 of which will be unassembled and destroyed in testing. Required delivery for the first article is 180 days from contract award date. Government is allowed 60 days to test the first article. 0011AB Production quantity of 20 each. Required delivery 90 days after receipt of first article approval notification. 0012 First Article Test / Inspection Report data line item. Required delivery 180 days from contract award date. Government allowed 110 days to review the report. Bid B (if first article is not required) consists of only item 0011AC with a quantity of 21 each and required delivery of 90 days after contract award. Item 0013, NSN: 1680-00-482-1825UC, P/N: 5905-101C, C-5 Flap Position Computer Assembly. Dimensions: H 7? L 7? W 7?. Weight 7.8lbs. Material: Aluminum Alloy. Function: Receives inputs from the flap handle which in turn drives the actuators which drive the trailing edge flaps. Bid A (if first article is required) shall consist of items 0013AA, 0013AB, and 0014; as follows. 0013AA First Article requirement of 2 each, 1 of which will be unassembled and destroyed in testing. Required delivery for the first article is 110 days from contract award date. Government is allowed 60 days to test the first article. 0013AB Production quantity range of 3 to 20 each. Required delivery 90 days after receipt of first article approval notification. 0014 First Article Test / Inspection Report data line item. Required delivery 110 days from contract award date. Government allowed 110 days to review the report. Bid B (if first article is not required) consists of only item 0013AC with a quantity range of 4 to 20 each and required delivery of 90 days after contract award. Items 0001, 0003, 0005, 0007, 0009, 0011, and 0013 each have 2 annual options, (First year, Second year), with a quantity range of 1 to 5. Required delivery for the options is 90 days after exercise of each respective option. All items to be manufactured in accordance with the Government supplied data. The approximate RFP issue date will be 13 Aug 01 with the approximate response date of 12 Sep 01. RFP will be available for viewing or downloading from www.FedBizOpps.gov only. No telephone requests. NO HARD COPIES WILL BE ISSUED. Restricted to Thomas Instrument and Machine Co Inc (CAGE 5H860), 3440 First St, PO Box 999, Brookshire TX 77423-0999. All potential sources should contact the PCO identified above for additional information and/or to communicate concerns, if any, concerning this acquisition. If your concerns are not satisfied by the Contracting Officer, an Ombudsman has been appointed to hear serious concerns that are not resolved through established channels. The purpose of the Ombudsman is not to diminish the authority of the Program Director or Contracting Officer, but to communicate serious contractor concerns, issues, disagreements, and recommendations to the appropriate Government personnel. When requested, the Ombudsman will maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of the proposals or in the source selection process. When appropriate, potential offerors may contact Ombudsman Maj Chris Harrington, Chief, Contract Policy Division, at 478-926-2604. Please be prepared to identify previous contacts made by you in an attempt to resolve your concerns. This acquisition may/does involve technology that has a military or space application. The only US contractors who may participate are those that are certified and registered with DLSC (1-800-352-3572) and have a legitimate business purpose. US contractors must submit a copy of their current, approved DD Form 2345 with their request for password access. To request this certification, write to the Commander, Defense Logistics Services Center, ATTN: DLSC-FEB, Federal Center, Battle Creek, MI 49017-3084 and request a copy of Dept. of Defense Form 2345 or call DLSC at the above number. The data package will be made available to the data custodian identified in block 3 of the DD Form 2345. The extent of foreign participation has not yet been determined. MOU country sources must contact the Contracting Officer within 15 calendar days of the date of this synopsis notice to receive a copy of the solicitation at the time it is initially issued. Issuance of the RFQ will not be delayed to review requests from MOU country sources received after 15 days or from non-MOU country sources. Nothing in this notice contradicts other restrictions, identified in the synopsis notice or solicitation, regarding eligible sources (e.g., if this is a small-business set-aside, foreign sources may not participate as potential prime contractors but could, if otherwise eligible, participate as subcontractors). For assistance in interpreting the CBD announcements, please see the CBD Reader?s guide. See Notes #8, #22 and #26. New phone number for point of contact, Joey Walker, (478) 926-7092.
- Web Link
- Visit this URL for the latest information about this (http://www.eps.gov/spg/USAF/AFMC/WRALC/F09603-01-R-35166/listing.ht ml)
- Record
- Loren Data Corp. 20010725/16SOL007.HTM (D-204 SN50S759)
| 16 - Aircraft Components and Accessories Index
|
Issue Index |
Created on July 23, 2001 by Loren Data Corp. --
info@ld.com
|
|
|
|