Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF JULY 23, 2001 PSA #2898
SOLICITATIONS

41 -- 41 -- AIR FILTRATION AND INSTALLATION SERVICES AT SSA

Notice Date
July 19, 2001
Contracting Office
Social Security Administration, Deputy Commissioner for Finance, Assessment and Management, Office of Acquisition and Grants, 1710 Gwynn Oak Avenue, Baltimore, MD, 21207-5279
ZIP Code
21207-5279
Solicitation Number
SSA-RFQ-01-0282
Response Due
July 24, 2001
Point of Contact
Stephen Slaughter, Contract Specialist, Phone 410-965-9533, Fax 4109669310, Email stephen.slaughter@ssa.gov
Description
Amendment Number Two (2) to SSA-RFQ-01-0282 The purpose of this amendment is to amend the solicitation and also to extend the due date and time for receipt of RFQ responses. PRODUCTION ENVIRONMENT Amend the third to last sentence to read: The air space surrounding the collection bin of the PB Y190 Trimmer/Vacuum unit will be the only finishing system component that will require air filtration. FILTRATION/CLEANING REQUIREMENTS -- GENERAL Amend the first sentence to read: Contractor installed filtration equipment may be self-contained or installed using above ceiling ductwork. The following sentence is to be inserted following the first sentence: The floor of the production facility is concrete slab. FINISHING CONFIGURATION Amend the first sentence to read: Provide air space filtration where the PB Y190 Trimmer/Vacuum units are located. AIR CLEANING -- MAIN PRODUCTION AREA FILTRATION Amend the first sentence to read: Contractor installed filtration equipment may be self-contained or installed using above ceiling ductwork. The following sentence is to be inserted following the first sentence: The floor of the production facility is concrete slab. SOCIAL SECURITY CARD PRODUCTION AREA FILTRATION Amend the first sentence to read: Contractor installed filtration equipment may be self-contained or installed using above ceiling ductwork. The following sentence is to be inserted following the first sentence: The floor of the production facility is concrete slab. PHYSICAL SPECIFICATIONS Amend the first sentence to read: Contractor equipment may be installed at ceiling level or floor mounted. The following sentence is to be inserted following the first sentence: Floor mounted equipment shall not require more than 16 square feet of floor space. Accordingly, the closing date and closing time of the solicitation shall be changed to no later than 3:00 p.m., local prevailing time on Tuesday, July 24, 2001.
Web Link
Visit this URL for the latest information about this (http://www.eps.gov/spg/SSA/DCFIAM/OAG/SSA-RFQ-01-0282/listing.html)
Record
Loren Data Corp. 20010723/41SOL001.HTM (D-200 SN50S3Y5)

41 - Refrigeration, Air Condition and Air Circulating Equipment Index  |  Issue Index |
Created on July 19, 2001 by Loren Data Corp. -- info@ld.com