COMMERCE BUSINESS DAILY ISSUE OF JULY 20, 2001 PSA #2897
SOLICITATIONS
Z -- RELOCATE SQUADRON HEADQUARTERS, BUILDINGS 87 AND 76 -- NAVAL SUBMARINE BASE NEW LONDON, GROTON, CT
- Notice Date
- July 18, 2001
- Contracting Office
- C1(16) F010 OIC of Navfac Contracts, Nav Submarine Base New London, Box 26, Bldg 135, Groton, CT 06349-5026
- ZIP Code
- 06349-5026
- Solicitation Number
- N62472-00-B-5521
- Response Due
- August 28, 2001
- Point of Contact
- Contract Specialist Joyce Edmond, 860 694 5136; Contracting Officer Paul Krug, 860 694 4563
- Description
- This action originally published in the CBD under N62472-00-B-5521 is hereby modified as follows. The lump sum Base Bid shall include the total price for providing all work complete in accordance with the drawings and specifications, but not including the work indicated or specified to be provided under any option. Option 1 -- Building 76 1st Floor: Interior demolition; construction of interior walls and doors, electrical wiring, telephone lines, plumbing, including hot water heating modifications, ceiling tile and grid demolition, replacement, and new construction; relocation of window and through-wall air conditioners; interior and exterior painting. (Floor finishes remain part of the base contract). Option 2 -- Building 76 2nd Floor: Interior demolition; construction of interior walls and doors, electrical wiring, telephone lines, plumbing, including hot water heating modifications, ceiling tile and grid demolition, replacement, and new construction; relocation of window and through-wall air conditioners; painting. (floor finishes, provision and installation of rooftop air conditioning units and related fixtures, ductwork remain part of the base contract). Option 3 -- Building 87: 1st, 2nd, and 3rd Floors: Interior wall demolition, construction of new interior walls and doors, (not including electrical power, telephone lines, plumbing, hot water heating modifications) concrete demolition, patching and repair; ceiling tile and grid demolition, replacement, and new construction; relocation of window air conditioners. Includes demolition of raised floors limited to that required for modification of adjacent wall. Exterior painting. Option 4 -- Building 87: 4th Floors: Interior wall demolition, construction of new interior walls and doors, (not including electrical power, telephone lines, plumbing, hot water heating modifications) painting, ceiling tile and grid demolition, replacement, and new construction; removal and storage of light fixtures (reinstallation remains part of the base contract). All other information publicized in the original synopsis is correct.
- Record
- Loren Data Corp. 20010720/ZSOL048.HTM (W-199 SN50S1U4)