COMMERCE BUSINESS DAILY ISSUE OF JUNE 14, 2001 PSA #2872
SOLICITATIONS
F -- MANNING CANYON MILL SITE
- Notice Date
- June 12, 2001
- Contracting Office
- BLM, BC-660, Bldg #50, Denver Federal Center, P.O. Box 25047, Denver, CO 80225-0047
- ZIP Code
- 80225-0047
- Solicitation Number
- NAR010082
- Response Due
- August 2, 2001
- Point of Contact
- Ms. Marty Coffey, Procurement Technician, (303) 236-9439
- E-Mail Address
- Click here to contact the Procurement Technician (m30coffe@blm.gov)
- Description
- The Bureau of Land Management (BLM), has a need for contractor to provide services in support of constructing water diversion channels, provide cleanup of tailing materials, and construction of one capped repository. The work is located at the Manning Canyon Mill site, an abandoned gold milling facility located in the Oquirrh Mountains of Utah County, Utah, approximately 40 miles south of Salt Lake City, Utah. The site is accessible from State Highway 73 and is about three miles south of Cedar Fort, Utah. The work required will cover three construction seasons due to the availability of funding on a yearly basis. The first year (Base Line Item) will consist of cultural resource protection, sediment site management, and stabilizing existing containment dikes that have been heavily eroded. Required road building will take place. Tailing areas 1 and 2 will be prepared in such a manner that will allow the construction of a new diversion channel to the east of the repository. The channels around the repository are designed to pass the 500 year storm event. Sub-grade of the repository will be prepared for placement of the repository fill and the repository stabilization berm will be built. Top soiling, grading, and seeding of cleaned areas will take place. The second year, Optional Line Item 1, will continue with site management for the prevention of contaminated materials transport. Excavation, hauling, and placing of tailing materials will continue to the repository. Placing topsoil, grading, and seeding clean, disturbed areas will also continue. The third year, Optional Line Item 2, will continue site management methods for control of contaminated sediments. Excavation and hauling of contaminated materials will continue to the repository. Clean and rebuild the Lewiston County Road. Construction and placement of cap materials will occur the third year. Remove and reclaim tailing dikes and sediment basins. Remove sediment site management structures, silt fences, etc. Placing topsoil, grading, and seeding of disturbed areas will be completed. Build fence around perimeter of the repository and install monitoring devices. The solicitation should be available on or about June 28, 2001. The proposed contract is 100% set-aside for small business concerns. All responsible sources may submit a proposal which will be considered. Requests for the solicitation may be by facsimile directed to (303) 236-9470. See Notes 26 and 27.*****
- Record
- Loren Data Corp. 20010614/FSOL003.HTM (W-163 SN50O6K3)
| F - Natural Resources and Conservation Services Index
|
Issue Index |
Created on June 12, 2001 by Loren Data Corp. --
info@ld.com
|
|
|
|