COMMERCE BUSINESS DAILY ISSUE OF MARCH 23, 2001 PSA #2814
SOLICITATIONS
Z -- TAKE DOWN, STORE AND RE-INSTALL IF NEEDED, POOL AIR STRUCTURE, HANSCOM AFB, MA
- Notice Date
- March 21, 2001
- Contracting Office
- ESC/PKOP, Services Branch, Operational Contracting Division, 104 Barksdale St., Hanscom AFB, MA 01731-1806
- ZIP Code
- 01731-1806
- Solicitation Number
- F19650-01-Q-0015
- Response Due
- April 4, 2001
- Point of Contact
- VERA STRICKLAND, CONTRACT SPECIALIST, 781-377-6737; CHRISTINE DOLAN, CONTRACTING OFFICER, 781-377-2236
- E-Mail Address
- Click Here to E-mail the POC (vera.strickland@hanscom.af.mil; christine.dolan@hanscom.af.mil)
- Description
- (i)This is a combined Synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) Solicitation No.F19650-01-Q-0015 is issued as a Request For Quote (RFQ) The NAICS Code for this synopsis/solicitation is 235990.This document incorporates provisions and clauses that are in effect through Federal Acquisition Circular FAC 97-22 (iii) CLIN 0001: Take Down: The contractor shall be responsible for the entire take down of the air structure and all of its related parts and equipment. The contractor shall be responsible for all material needed for a safe take down of the structure to include all plastic polyethylene. Parts and equipment are the Air Structure, Field Seam, Anchor Bolts, Angle Iron, Main Entry, Revolving Door and Platform, 2ea. Emergency Exit Doors, Cables Lights, Frame around heat system and all other relayed parts and equipment. The contractor shall insure the air structure is dry then fold the structure and place on pallets provided by Government. The contractor shall accomplish this in accordance with the manufactures recommended procedures. CLIN 0002: The contractor shall transport and store the air structure with all of its related parts and equipment in a dry secure area. The trailer will be store in the CES compound outside the RV lot with the revolving door being put inside the RV lot. OPTION CLIN 0003: The contractor shall insure that all of the necessary parts are together and ready to make installation of the air structure. The contractor shall pre erect all metal doors and hardware and repair or replace damaged parts. In sure that the revolving door is in good operating condition, make all necessary repairs to insure proper operation. Lay out the air structure in a dry area and inspect for damage that may inhabit the installation. Properly clean the inner and outer layers before Inflation. Make all necessary repairs to air structure's inner and outer layers as necessary to insure proper inflation. Make all repairs per manufacture's recommended procedures. Run the guide wires across the pool to carry the bubble. Insure that the interior pool lining is protected from damage by laying plywood or other material in the pool, around the concrete perimeter deck of the pool and making the workers wear soft soled shoes. The contractor shall be responsible for any and all damages to the Air Structure and shall make all necessary repairs at no cost to the Government. Insure that the air structure is secure in all respects to the tie down bolts and that support wires are properly placed before starting to inflate the air structure. The contractor shall insure that the air structure is installed according to the manufacture's recommended procedures. Scope: The work covered in this Statement of Work consists of furnishing all plant, personnel, labor, materials, tools, equipment and transportation necessary to perform all operations in connection with the complete take down, storage and re-installation of Government furnished Air Structure to include all wires tie downs entryways, anchors, angle iron, cables etc. In the event that re-installation is not need, Hanscom AFB will make provisions for disposal of the air structure. Work will be accomplished at Building #1550 Base Pool, Hanscom AFB, Bedford, MA. The work to be performed consists of the following principle features and must meet all Local, State and Federal Codes. The Contractor shall have a supervisor on site at all times during installation. Normal Working Hours will be Monday through Friday, 0730 to 1630 (excluding weekends and holidays). Any changes to these hours shall be coordinated through the Contracting Office, 72 hours in advance. Take down 4,5,6, and 7 May 2001. Reinstall (if needed) in the fall prior to 1 Oct 01. Dates to be chosen by others. Contractor will receive a 14 day notice prior to installation. The Contractor shall notify Nicole Craver at 781-377-5316 at least 48 hours prior to construction start. Contractor shall be responsible for daily clean up of the work site, more often as necessary to maintain a clean and safe working environment. The following provisions and clauses apply to this procurement: FAR 52.212-1, Instructions to Offerors Commercial; FAR 52-212-2, Evaluation-Commercial Items; FAR 52-212-3, Offeror Representations and Certifications-Commercial Items; FAR 52-212-4 Contract Terms and Conditions-Commercial Items; FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items. (in paragraph b the following clauses apply: FAR 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37) FAR 52.204-6, Contractor Identification Number-Date Universal Numbering Systems DUNS Number; FAR 52.323-33, Payment by electronic funds transfer-Central Contractor Registration (CCR); and DFARS 252.204-7004, required Contractor Registration (Mar 1998). Clauses and provisions maybe accessed in full text at http://farsite.hill.af.mil. All offers are due no later than Close of Business 4 April 2001. Offers may be mailed to ESC/PKOP, ATTN Vera Strickland, 20 Schilling Circle, Building 1305, 3rd Floor, Hanscom AFB, MA 01731-2800; or E-mailed to vera.strickland@hanscom.af.mil or faxed to 781-377-4324, ATTN Vera Strickland.
- Web Link
- N/A (N/A)
- Record
- Loren Data Corp. 20010323/ZSOL016.HTM (D-080 SN50G8W6)