Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 5, 2000 PSA #2700
SOLICITATIONS

Y -- PREQUALIFICATION OF DESIGN/BUILD CONTRACTORS FOR THE LOS ANGELES, CA MAR VISTA STATION

Notice Date
October 3, 2000
Contracting Office
Facilities Service Office, U.S. Postal Service, 395 Oyster Point Blvd., South San Francisco, CA 94099-0300
ZIP Code
94099-0300
Solicitation Number
052571-01-A-0002
Response Due
November 8, 2000
Point of Contact
Paul Kelly, (323)729-4371 or Grace Batesting (650)615-7206
Description
The United States Postal Service (USPS) intends to issue a fixed price Design/Build contract for design and construction of the new Mar Vista Station on leased property in the City of Los Angeles at the corner of Venice Blvd. and Grandview Ave.. The project includes the demolition of an existing 22,500 square foot building and the design and construction of a new 77,000 square foot multi level facility of which 51,000 square feet is parking. Project completion is scheduled for 365 calendar days after award of the contract. The overall development expected under this contract consists of, but is not limited to, the following: (a) Design and preparation of the construction drawings, calculations, and technical specifications for the new facility.. Design to be in conformance with latest codes in use by the city of Los Angeles and USPS design criteria and standards.. (b) Design review meetings with USPS and coordination with the City of Los Angeles. (c) Construction of the building and development of the site, including demolition of existing an existing building and paving, , construction of all on-site improvements, utility connections, underground storm drainage system, and fire protection sprinkler and fire alarm systems, to result in a complete and operable facility. The estimated range is $6,000,000 to $7,000,000. Firms interested in being placed on the prequalified contractors list must submit a completed Design/Build Qualification Statement. The Postal Service is interested in selecting the most highly qualififed firms utilizing the information provided in the Design/Build Qualification Statement. Firms placed on the pre-qualified list will be issued a solicitation package for the Mar Vista project and be given the opportunity to submit a project specific Management Plan and Cost Proposal. A Qualififcation Statement package may be obtained by written request to Ms. Grace Batesting at the Pacific Facilities Service Office, 395 Oyster Point Blvd., Suite 225, South San Francisco 94099-0300. Firms that include an email address will receive the package from the Postal Service via email. In lieu of a written request firms may email their request to Grace Batesting (gbatesti@email.usps.gov) or to Mr. Paul Kelly (pkelly1@email.usps.gov). All Prequalification statements will remain confidential and not returned.. One orignal and three copies of the completed prequalification statement must be submitted to the Pacific Facilities Service Office no later than November 8, 2000, 3:00PM. Offerors are encouraged to submit their prequalification statement via U. S. Postal Service First Class, Priority or Express Mail. Firms not selected for placement on the prequalified list will be notified within 60 days of receipt of their prequalification statement.
Record
Loren Data Corp. 20001005/YSOL004.HTM (W-277 SN5034M3)

Y - Construction of Structures and Facilities Index  |  Issue Index |
Created on October 3, 2000 by Loren Data Corp. -- info@ld.com