Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 24,2000 PSA#2671

Wiesbaden Regional Contracting Center, Attn: AEUCC-C-A, CMR 410 Box 744, APO AE 09096

W -- AERIAL SURVEILLANCE PLATFORM SOL DAJA22-00-R-1027 DUE 082800 POC Christopher Popp, Contracting Officer/Yanina Seeger, Specialist, 011-49-611-816-2192, FAX-2198 E-MAIL: Click here to contact contract specialist for this, seegery@rcc.wbn.usacce.army.mil. This is Amendment 0001 to the subject combined CBD synopsis/solicitation posted in the CBD net on 17 Aug 2000 (synopsis # 487218) to include the responses to the questions below. Offerors shall consider this amendment in their proposal. Date for submission of offers is extended from 25 Aug 2000 to 28 Aug 2000, 0900 hours, CET. Note "Q" stands for question and "R" for response. Q1- What are the minimum aircraft technical/performance capabilities? a. Minimum Endurance? R- 6 HOURS; b. Minimum Cruise Speed? R-150kts c. FAA Certification for Flight Into Known Icing Conditions? R- REQUIRED, THIS IS VERY NECESSARY. Q2- What are the minimum surveillance equipment/technical capabilities? R2- EO (color Day Camera); FLIR -- both EO & FLIR must provide one meter resolution at a 5000m slant range, must also include GPS stamping to indicate aircraft/target position; Digital Framing Camera; Laser Illuminator; Real-time video down-link to a ground station at a minimum 50nm range. Q3- Please state the type of fuel to be provided by the Government. R3- 100LL (BLUE) OR 100/130 (GREEN) Q4- Do you have a specific beddown location for the aircraft? R4- Nothing specific, but the aircraft will beddown in one of the following locations: Tuzla, Bosnia-Herzegovina; Taszar, Hungary; Skopje, Macedonia. Q5- Do you have a minimum requirement on the type sensors installed in the aircraft? R5- EO (color Day Camera); FLIR -- both EO & FLIR must provide one meter resolution at a 5000m slant range, must also include GPS stamping to indicate aircraft/target position; Digital Framing Camera; Laser Illuminator; Real-time video down-link to a ground station at a minimum 50nm range. Q6- Will this be a 24 /7 operational requirement -- requiring more than one crew, or will missions be run on a set schedule? R6- The possibility exists for a 24hr, continuous surveillance mission, so two crews would be necessary. Q7- What is the minimum required flight endurance without refueling? R7- Minimum flight endurance is 6 hours w/o refueling. Posted 08/22/00 (W-SN488530). (0235)

Loren Data Corp. http://www.ld.com (SYN# 0125 20000824\W-0001.SOL)

W - Lease or Rental of Equipment Index  |  Issue Index |


Created on August 22, 2000 by Loren Data Corp. -- info@ld.com