COMMERCE BUSINESS DAILY ISSUE OF AUGUST 14,2000 PSA#2663 Procurement Branch, Federal Trade Commission, 6th and Pennsylvania
Avenue, N.W., Room 702, Washington, DC 20580 61 -- BACKUP GENERATOR AND INSTALLATION SOL 290000-00-Q-0018 POC Eric
Vogt (202) 326-2259 The Federal Trade Commission has a requirement for
1 Each Backup Diesal Generator and installation. Generator requirements
are as follows: 300KW/375KVA, 3 phase-4wire, 120/208v-60Hz, outdoor,
air cooled, adjustable isochronous speed sensing electric govenor, NFPA
30 and 37 compliant fuel system, NFTA 70,99 and 110 compliant. A
selectable control and monitoring system for both manual and automatic
operation with appropriate guages and devices for monitoring volts
amps, temperatures oil pressures, etc. 5 year warranty and 12 month
maintenance required. Installation is required to be completed no later
than 12/30/00. It is anticipated that quotations will be due September
15, 2000. Fax request for solicitation to Eric Vogt, (202) 326-3529.
Only faxed or written requests will be accepted. This requirement is
being solicited under FAR Part 13, Simplified Acquisition Procedures.
Posted 08/10/00 (W-SN484403). (0223) Loren Data Corp. http://www.ld.com (SYN# 0299 20000814\61-0003.SOL)
| 61 - Electric Wire and Power and Distribution Equipment Index
|
Issue Index |
Created on August 11, 2000 by Loren Data Corp. --
info@ld.com
|
|
|