COMMERCE BUSINESS DAILY ISSUE OF AUGUST 10,2000 PSA#2661 USDA Forest Service, Contracting, P.O. Box 21628, Juneau, AK
99802-1628 Z -- BBVC PARKING LOT SOL IFB R10-00-05 DUE 091500 POC Contact, Kent
Kohlhase (907) 271-2807/Contracting Officer, Walt Ullmayer (907)
586-7903 E-MAIL: Click here to contact the Contracting Officer via,
wullmayer@fs.fed.us. This project consists furnishing materials for and
construction of seven sub-projects at the Begich, Boggs Visitor Center.
These subprojects include the following: 1. Widening an existing road
intersection, including excavation, placement of approximately 9 tons
of crushed aggregate base course, and placement of approximately 16
tons of asphalt pavement. 2. Repair of an existing road, including
placement of approximately 54 tons of crushed aggregate base course,
placement of approximately 20 tons of asphalt pavement, placement of
approximately 198 square meters of riprap, and construction of
approximately 92 meters of concrete curb. 3. Removal and replacement of
approximately 253 meters of concrete curb and gutter. 4. Reconditioning
of an existing aluminum handrail, including installation of two new
posts, and welding new work to existing work. 5. Construction of
concrete surface drain in an existing parking lot, including removal of
existing asphalt and placement of approximately 53 meters of 1-meter
wide concrete surface drain. 6. Seal coat and striping, including seal
coat of approximately 13,769 square meters of asphalt pavement and
painting of approximately 2814 meters of 100-mm wide striping and other
minor striping and painting. 7. Site improvement work at an existing
site, including removal of approximately 121 square meters of existing
concrete sidewalk, construction of approximately 62 square meters of
concrete sidewalk, construction of approximately 108 meters of concrete
curb and gutter, placement of approximately 7 tons of asphalt concrete,
and placement of approximately 542 square meters of riprap. Begich,
Boggs Visitor Center is located at approximately mile 5 of the Portage
Highway. Portage Highway is located at approximately mile 78 of the
Seward Highway, approximately 49 miles south of Anchorage, AK. The
estimated start work date is 092500. The contract time will be 240
calendar days. Estimated price range for the project is between
$100,000 and $250,000. If you would like to receive a solicitation, you
may fax your request to (907) 586-7090 or you may send your request by
mail, telephone or e-mail. The solicitation WILL NOT be sent via
e-mail, so your request will need your mailing address. Posted 08/08/00
(W-SN483878). (0221) Loren Data Corp. http://www.ld.com (SYN# 0128 20000810\Z-0010.SOL)
| Z - Maintenance, Repair or Alteration of Real Property Index
|
Issue Index |
Created on August 8, 2000 by Loren Data Corp. --