COMMERCE BUSINESS DAILY ISSUE OF JULY 14,2000 PSA#2642 US Army Engineer District, Honolulu, Building 230, Attn: CEPOD-CT, Fort
Shafter, HI 96858-5440 C -- ARCHITECT-ENGINEER SERVICES. FY02 MCA PN 48783 PH2C, WHOLE
BARRACKS RENEWAL, SCHOFIELD BARRACKS, HAWAII SOL DACA83-00-R-0036 DUE
081600 POC Mr. Richard Mori, (808) 438-0230 WEB: Honolulu Engineer
District Contracting Home Page:, http://www.poh.usace.army.mil/pohct/.
E-MAIL: Click here to contact the contract specialist via,
duane.v.inoue@poh01.usace.army.mil. 1. CONTRACT INFORMATION:
Architect-Engineer services, procured in accordance with PL 92-582
(Brooks A-E Act) and FAR Part 36, are required for the design of FY02
MCA PN 48783 PH2C, Whole Barracks Renewal, Schofield Barracks, Hawaii.
This announcement is open to all businesses regardless of size. A
firm-fixed price contract will be negotiated. The contract is
anticipated to be awarded in October 2000. The selected firm, if a
large business firm, must comply with FAR 52.219-9 regarding the
requirement for submitting and negotiating a subcontracting plan. The
subcontracting goals for this District are: (1) at least 65% of the
subcontract amount be placed with small businesses (SB), which includes
SDBs and women-owned small businesses (WOSB); (2) at least 15% of the
subcontract amount be placed with SDBs; and (3) at least 5% of the
subcontract amount be placed with WOSBs. The subcontracting plan is not
required with this submittal but the successful large business firm
must submit an acceptable plan beforeany award can be made. The
subcontracting plan is not required with this submittal but the
successful large business firm must submit an acceptable plan before
any award can be made. For information on locating SB, SDB, and WOSB
firms, contact Ms. Monica Kaji, Deputy for Small Business, at
(808)438-8586 or e-mail her at monica.kaji@usace.army.mil. 2. PROJECT
INFORMATION: Design of FY02 MCA PN 48783 PH2C, Whole Barracks Renewal,
Schofield Barracks, Hawaii. Estimated Construction Cost is between
$15,000,000 to $30,000,000. Project provides for construction of 272 SM
Soldier Gear Wash Areas, 2999 SM Battalion Headquarters (2 story Small
Battalion Headquarters, 2 story Special Large Battalion Headquarters),
979 SM Brigade Headquarters. Site work includes roadway construction
and realignment, grading and landscaping. Site utilities to include
water, sewer, drainage, electrical and communications. Design will
utilize standard design criteria and definitive drawings to the maximum
extent possible and shall be in metric units. Project includes
environmental requirements, topographic surveys and geotechnical work.
3. SELECTION CRITERIA: See Note 24 for general selection process. The
selection criteria are listed below in descending order of importance
(first by major criterion and then by each sub-criterion). Criteria a
through e are primary. Criteria f through h are secondary and will
only be used as "tie-breakers" among technically equal firms. (a)
Specialized experience and technical competence in the design of
Battalion and Brigade Headquarters. (1) The evaluation will consider
the offeror's specialized experience in the design of Battalion and
Brigade Headquarters, Anti-Terrorism/Anti-Force protection, site work
and construction phasing. (2) The evaluation will consider technical
competence of the offeror in terms of design quality management, CADD
and other automated systems and equipment resources. (3) The evaluation
will consider the effectiveness of the proposed project team with
respect to management structure,coordination of disciplines and prior
working relationship within team members. (b) Professional
qualifications of the firm's staff/consultants to be assigned to the
projects. (1) The evaluation will consider the education, training,
registration and overall relevant experience of the team's key
management and technical personnel. (2) The evaluation will consider
the longevity with the firm or firms of the key personnel to be used on
this project. (c) The firm's past performance on previous similar
projects. (1) The evaluation will consider all past experience of the
prime AE contractor as documented on the Corps of Engineers
Architect-Engineer Contract Administration Support System (ACASS). (2)
The evaluation will consider all past experience from sources other
than ACASS only if submitted in response to this announcement. In
evaluation of both these sub-criteria, the relevancy of each
performance evaluation to the proposed contract including type of work,
contract value, performing office, recentness and general trends will
be considered. (d) Capacity of the firm to accomplish work in the
required time and in the prescribed manner. (1) The evaluation will
consider the firm's experience with similarly sized projects. (2) The
evaluation will consider the available capacity as well as total
strength of key disciplines in the offices to perform the work. (3) The
evaluation will consider a firm's current workload and workload trends.
(e) Knowledge of the locality. (1) The evaluation will consider the
offeror's familiarity with the site conditions, including geological
and climatic conditions of Schofield Barracks and the Island of Oahu.
(2) The evaluation will consider the offeror's knowledge of local
construction practices and availability and cost of materials for the
proposed project construction. (f) Small disadvantaged business (SDB)
participation. The evaluation will consider participation of small
disadvantaged business in the proposed contract team, measured as a
percentage of the estimated effort. (g) Volume of DoD contract awards.
(h) Geographic proximity. The evaluation will consider the physical
location of the firm and their team in relation to Schofield Barracks.
With regards to SDB participation, the offeror must provide adequate
documentation in blocks 7g and 10 of the Standard Form 255,
Architect-Engineer and Related Services Questionnaire for Specific
Project, to illustrate the extent of SDB participation in terms of the
percentage of the total anticipated contract effort, including the
prime contractor, joint venture partners, team members, and
subcontractors. The offeror must provide targets as expressed as
dollars and percentages of total contract value, in each of the
authorized SIC Major Groups (see FAR 19.201(b) and web page at
http://www.arnet.gov/References/sdbadjustments.htm). The targets will
be incorporated into and become part of the resulting contract. 4.
SUBMISSION REQUIREMENTS: Firms desiring consideration must submit a
Standard Form 255 no later than 4:00 p.m., Hawaiian Standard Time,by
the due date shown above or within thirty (3) calendar days from date
of this announcement, whichever is later. Should the due date fall on
a weekend or holiday, the submittal package will be due the first
workday thereafter. All responding firms must also include completed
Standard Form 254 for themselves and their subconsultants, if not
already on file with the Honolulu Engineer District. Submittals will be
sent to U. S. ARMY ENGINEER DISTRICT, HONOLULU, BUILDING 230, ROOM 108,
ATTN: CEPOH-EC-M, FORT SHAFTER, HAWAII 96858-5440. Small and
disadvantaged firms are encouraged to participate as prime contractors
or as members of joint ventures with other small businesses. All
interested parties are reminded that the successful contractor will be
expected to place subcontracts to the maximum possible extent with
small and disadvantaged firms in accordance with the provision of
Public Law 95-507. All contractors are advised that registration in the
DoD Central Contractor Registration (CCR) database is requiredprior to
award of a contract. Failure to be registered in the DoD CCR prior to
award may render your firm ineligible for award. Information about CCR
can be found by calling 1-888-227-2423 or via the Internet at
http://www.ccr2000.com/. For further information regarding this
proposed acquisition, telephone (808) 438-0481. Request for Proposal
No. DACA83-00-R-0036 shall be utilized to solicit a proposal from the
firm selected. This is not a request for a proposal. Posted 07/12/00
(W-SN474188). (0194) Loren Data Corp. http://www.ld.com (SYN# 0014 20000714\C-0003.SOL)
| C - Architect and Engineering Services - Construction Index
|
Issue Index |
Created on July 12, 2000 by Loren Data Corp. --
info@ld.com
|
|
|