|
COMMERCE BUSINESS DAILY ISSUE OF MAY 5,2000 PSA#2594General Services Administration, Property Management Division, Central
Heating & Refrigeration Plant, 13th & C Streets, S.W., 2nd Floor
Office, Washington, DC 20407 K -- MODIFY BOILER CONTROLS LOGIC SOL GS11P00YMC0102 DUE 060900 POC
Mark LaTorre, 202-690-9720 E-MAIL: Dave.Mbonu@gsa.gov,
Priscilla.Chaney@gsa.gov. GSA,HOTD/Central Heating & Refrigeration
Plant is soliciting proposals from small businesses to award a contract
to modify the Bailey INFI 90 boiler control logic and upgrade the PC
View software to the latest available version. Central Heating &
Refrigeration Plant currently has four boilers connected to the Bailey
INFI net 90 distributed control system. The operator interface
currently being used is LAN-90 Process Control View (5.2). Central
Plant has recently experienced boiler trips due to its boilers
responding to demand too rapidly. This rapid response caused large
swings in boiler drum level ultimately moduify and tune the boiler
logic. It is the intention of this contract to modify and tune the
boiler logic in such a way as to optimize boiler response to plant
demand. A pre-proposal conference including walk thru of the job site
has been scheduled for 9AM, Friday, May 19, 2000 at the Central Heating
& Refrigeration Plant. All interested bidders are required to attend.
Call PriscillaChaney on 202-690-9728 for complete bid package. Requests
for bid package will be accepted through June 2, 2000. Bids are due no
later than 12:00 PM, June 9, 2000 Posted 05/03/00 (W-SN450873).
(0124) Loren Data Corp. http://www.ld.com (SYN# 0054 20000505\K-0001.SOL)
K - Modification of Equipment Index Page
|
|