Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 15,2000 PSA#2557

Talisman Partners, Ltd., 5460 South Quebec St., Suite 100, Englewood, Co 80111-1916

E -- PRIVATIZATION UNDER 10 USC 2688, UTILITY SYSTEMS: CONVEYANCE AUTHORITY AT SHAW AFB, SUMTER, SC. DUE 041200 POC Bill Gruen or Joel Theis 303/771-3103 E-MAIL: Email to POC, bgruen@talpart.com. The Air Force seeks to identify responsible potential sources and obtain information in regards to privatization of utility systems in accordance with 10 USC 2688, "Utility Systems: Conveyance Authority". The Air Force is seeking interest and information specifically for the potential privatization of the natural gas distribution and wastewater collection systems at Shaw AFB, South Carolina. OBJECTIVE: Should privatization result, the ownership of the Shaw AFB natural gas distribution and wastewater collection systems, operation and maintenance and obligation to continue to provide utility service for an indefinite and ongoing period will transfer to a utility service provider. All responsibility for maintaining reliable utility service, including such items as environmental compliance, maintenance costs, major system renovations, construction, equipment, manpower and overhead costs will become the utility service provider's responsibility. It is intended that the privatization will ultimately reduce the Air Force's life-cycle costs for operating and maintaining utility systems and services. SYSTEM DESCRIPTIONS: The following is provided only to give an approximation of the size, scope and general description of the system(s). Any numbers should only be used for estimating purposes. The following system parameters are approximations: Shaw AFB: Base Size: 3,354 acres. 1,772 facilities, of which 883 are Military Family Housing (MFH) facilities. Natural Gas Distribution System: Approximate Annual Consumption: 134,280 MCF. Gas Mains: 33,800 LF on the main base, 74,000 LF in MFH. Propane-Air Station: 60,000-gallon capacity, 1 compressor building, 1 air compressor, 1 regulator station, 1 vaporizer and 2 liquid propane pumps. Wastewater Collection: Sanitary Sewer Mains: 133,500 LF on the main base, 108,200 LF in MFH. Eleven sewage pump stations. Wastewater Treatment Plant: 1.2 million gallons per day (mgd) capacity plant. Average daily flow is 0.8 mgd. There is no pretreatment plant. PROCEDURES: This request to interested parties is for gathering information and is a required component of a systematic process to evaluate the interested parties under the Air Force's utilities privatization program. In order to minimize costs both to potentially interested parties and the government, this notice is being issued to determine the interest and feasibility of proceeding with a formal request for proposals. Should insufficient credible interest be identified for a privatization action, it is highly likely that no formal solicitation will be issued. SHOULD INTEREST BE DETERMINED SUFFICIENT, A FORMAL REQUEST FOR PROPOSALS MAY BE FORTHCOMING. Small Business interests shall note the FAR Part 19 Standard Industrial Codes (SIC) and Size Standards for the utility systems identified in this announcement. Some, all, or any combination of the following may apply. SIC/SS: 4911/4Million (M) Megawatt hours, 4922/$5M, 4923/$5M, 4924/500, 4925/$5M, 4931/$5M, 4932/$5M, 4939/$5M, 4941/$5M, 4952/$5M, 4953/$6M, 4959/$5M, 4961/$9M, 4971/$5M. REQUESTED RESPONSE: Interested parties should provide a statement of interest on company letterhead (not to exceed 20 pages in length). The statement should include as a minimum the following criteria: (1) capability and experience in ownership, operation and maintenance of similar utility systems, (2) financial capacity to purchase, expand and operate the utility systems; (3) statement detailing the understanding of the obligation to serve in regards to continuous utility service; (4) statement detailing the legal right to serve, own, operate, and maintain utility systems within state laws and an understanding of any applicable federal, territorial and local utility laws, regulations or franchise requirements affecting utilities in the territory, and capability of complying with such requirements; and (5) statement detailing the understanding of federal, territorial, and local environmental laws and regulations and familiarity and experience with environmental compliance procedures and regulations forthe State of South Carolina and the U. S. Environmental Protection Agency. Elaborate proposals or pricing information is neither required nor desired. Under no circumstances will cost data for the existing systems be provided. Any innovative and new conceptual ideas to achieve the stated objective are encouraged. If a site visit and the provision of additional data are later determined necessary, notification will be provided by way of an amendment to this announcement. It should be noted that RFIs for different utility systems may be issued in the same time frame. A separate response to each RFI is required. The point of contact is Bill Gruen or Joel Theis, 303/771-3103. Posted 03/13/00 (W-SN433928). (0073)

Loren Data Corp. http://www.ld.com (SYN# 0026 20000315\E-0001.SOL)


E - Purchase of Structures and Facilities Index Page