COMMERCE BUSINESS DAILY ISSUE OF MARCH 15,2000 PSA#2557Talisman Partners, Ltd., 5460 South Quebec St., Suite 100, Englewood,
Co 80111-1916 E -- PRIVATIZATION UNDER 10 USC 2688, UTILITY SYSTEMS: CONVEYANCE
AUTHORITY AT SHAW AFB, SUMTER, SC. DUE 041200 POC Bill Gruen or Joel
Theis 303/771-3103 E-MAIL: Email to POC, bgruen@talpart.com. The Air
Force seeks to identify responsible potential sources and obtain
information in regards to privatization of utility systems in
accordance with 10 USC 2688, "Utility Systems: Conveyance Authority".
The Air Force is seeking interest and information specifically for the
potential privatization of the natural gas distribution and wastewater
collection systems at Shaw AFB, South Carolina. OBJECTIVE: Should
privatization result, the ownership of the Shaw AFB natural gas
distribution and wastewater collection systems, operation and
maintenance and obligation to continue to provide utility service for
an indefinite and ongoing period will transfer to a utility service
provider. All responsibility for maintaining reliable utility service,
including such items as environmental compliance, maintenance costs,
major system renovations, construction, equipment, manpower and
overhead costs will become the utility service provider's
responsibility. It is intended that the privatization will ultimately
reduce the Air Force's life-cycle costs for operating and maintaining
utility systems and services. SYSTEM DESCRIPTIONS: The following is
provided only to give an approximation of the size, scope and general
description of the system(s). Any numbers should only be used for
estimating purposes. The following system parameters are
approximations: Shaw AFB: Base Size: 3,354 acres. 1,772 facilities, of
which 883 are Military Family Housing (MFH) facilities. Natural Gas
Distribution System: Approximate Annual Consumption: 134,280 MCF. Gas
Mains: 33,800 LF on the main base, 74,000 LF in MFH. Propane-Air
Station: 60,000-gallon capacity, 1 compressor building, 1 air
compressor, 1 regulator station, 1 vaporizer and 2 liquid propane
pumps. Wastewater Collection: Sanitary Sewer Mains: 133,500 LF on the
main base, 108,200 LF in MFH. Eleven sewage pump stations. Wastewater
Treatment Plant: 1.2 million gallons per day (mgd) capacity plant.
Average daily flow is 0.8 mgd. There is no pretreatment plant.
PROCEDURES: This request to interested parties is for gathering
information and is a required component of a systematic process to
evaluate the interested parties under the Air Force's utilities
privatization program. In order to minimize costs both to potentially
interested parties and the government, this notice is being issued to
determine the interest and feasibility of proceeding with a formal
request for proposals. Should insufficient credible interest be
identified for a privatization action, it is highly likely that no
formal solicitation will be issued. SHOULD INTEREST BE DETERMINED
SUFFICIENT, A FORMAL REQUEST FOR PROPOSALS MAY BE FORTHCOMING. Small
Business interests shall note the FAR Part 19 Standard Industrial Codes
(SIC) and Size Standards for the utility systems identified in this
announcement. Some, all, or any combination of the following may apply.
SIC/SS: 4911/4Million (M) Megawatt hours, 4922/$5M, 4923/$5M, 4924/500,
4925/$5M, 4931/$5M, 4932/$5M, 4939/$5M, 4941/$5M, 4952/$5M, 4953/$6M,
4959/$5M, 4961/$9M, 4971/$5M. REQUESTED RESPONSE: Interested parties
should provide a statement of interest on company letterhead (not to
exceed 20 pages in length). The statement should include as a minimum
the following criteria: (1) capability and experience in ownership,
operation and maintenance of similar utility systems, (2) financial
capacity to purchase, expand and operate the utility systems; (3)
statement detailing the understanding of the obligation to serve in
regards to continuous utility service; (4) statement detailing the
legal right to serve, own, operate, and maintain utility systems within
state laws and an understanding of any applicable federal, territorial
and local utility laws, regulations or franchise requirements
affecting utilities in the territory, and capability of complying with
such requirements; and (5) statement detailing the understanding of
federal, territorial, and local environmental laws and regulations and
familiarity and experience with environmental compliance procedures
and regulations forthe State of South Carolina and the U. S.
Environmental Protection Agency. Elaborate proposals or pricing
information is neither required nor desired. Under no circumstances
will cost data for the existing systems be provided. Any innovative and
new conceptual ideas to achieve the stated objective are encouraged. If
a site visit and the provision of additional data are later determined
necessary, notification will be provided by way of an amendment to
this announcement. It should be noted that RFIs for different utility
systems may be issued in the same time frame. A separate response to
each RFI is required. The point of contact is Bill Gruen or Joel Theis,
303/771-3103. Posted 03/13/00 (W-SN433928). (0073) Loren Data Corp. http://www.ld.com (SYN# 0026 20000315\E-0001.SOL)
E - Purchase of Structures and Facilities Index Page
|
|