|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 23,2000 PSA#2542National Park Service, Cuyahoga Valley National Recreation Area, 15610
Vaghn Road, Brecksville, Ohio 44141 C -- INDEFINITE QUANTITY CONTRACT FOR ENGINEERING SERVICES FOR THE
VALLEY RAILWAY & OHIO & ERIE CANAL, NATIONAL PARK SERVICE, CUYAHOGA
VALLEY NATIONAL RECREATION AREA, BRECKSVILLE, OHIO 44141 SOL
RP616600028 POC Billy Davis, (402) 221-3464 The National Park Service
is seeking qualified organizations to provide Architech/Engineer (A/E)
services under an indefinite quantity contract for repair,
rehabilitation, reconstruction, addition to or construction of any
existing or proposed rail structures(s) or any of their component
systems/facilities, e.g. structural, mechanical or electrical: or
existing or proposed structures associated with the Ohio & Erie Canal
within the Cuyahoga Valley National Recreation Area and the proposed
Ohio & Erie Canal National Heritage Corridor Area. Types of services
required will include but not be limited to: Title I services-advance
technical analyses and investigation pertinent to railway and/or canal
structures(s); preparation of preliminary studies, sketches, layouts,
outlines; and advance cost estimates and other special services as
directed; Title II Services-adaptation of Government designs, drawings,
specifications and standards for railway and/or canal structures,
associated utilities, and appurtenances; preparing specifications, cost
estimates, bid proposals, or other contract documents; assisting in
issuing, securing, and analyzing bids or proposals; and interpreting
plans and specifications during the construction period, if the
Government performs the inspections; Title III Services-supervision and
inspection of construction and other post construction activities as
the Government may direct by individual delivery order, reviewing and
approving shop and other working drawings submitted by the Contractor
or his subcontractors, preparing operation and maintenance manuals, and
preparing record drawings showing construction as actually
accomplished. The Engineer shall provide all necessary services and
supporting activities in the field of railway engineering (including
but not limited to: general track design/rehabilitation, highway
crossing rehabilitation or replacement, and signalization
design/upgrading), civil engineering, environmental engineering
(including but not limited to: environmental site assessments, and
wetlands assessments, geotechnical engineering (including but not
limited to: geotechnical design/analysis for slope/bank stabilization,
drainage design/repair/replacement, and hydraulic analysis/design),
structural engineering, mechanical engineering, and electrical
engineering to prepare engineering documents for work orders to be
submitted in support of requirements identified by task order(s).
Sub-Contracting Goals: Large business firms are advised that a
sub-contracting plan is required by A/E contracts in excess of
$500,000.00. The NPS has adopted sustainable design as the guiding
principle for park planning and development. By definition, this means
meeting present needs without compromising the ability of future
generations to meet their own needs. In practice, sustainable design
utilizes best available solutions, within the design tradition of the
NPS, which conserves global resources, utilizes energy efficiently,
recycles materials and waste, and specifics ecologically responsible
methods, practices, and materials in the construction and operation of
park facilities. The following criteria shall be used in the
evaluation of the prospective firms in descending order of importance:
1. Professional qualifications necessary for satisfactory performance
of required services; 2. Specialized experience and technical
competence in the type of work required; 3. Capacity to accomplish the
work in the required time; 4. Past performance on contracts with
Government agencies and private industry in terms of cost control,
quality of work, and compliance with performance schedules; 5.
Knowledge of local conditions and ability of the firms to obtain
licensing in the State of Ohio; 6. Computer assisted design capability
and capacity; 7. Adequacy of facilities for performance of the work
including those necessary to provide specialized service that may be
required; 8. Availability of additional contractor personnel or
consultants to support expansion or acceleration of the project.
Contract period of performance will be for a one-year period from the
date of contract award, with a Government option to extend the period
of performance for four additional one-year periods. Services will be
implemented through individual delivery orders. The Government is
uncertain as to the number of delivery orders that will be placed
against the contract during the term of the contract; however, a
minimum of $5,000.00 in services is guaranteed for the basic ontract
period. The total of all delivery orders shall not exceed $500,000.00
per fiscal year. This procurement is open to small and large businesses
and is subject to Small Business Competitive Demonstration Program,
Pubic Law 100-656. To the fullest extent, the NPS welcomes the
participation of small business firms including women- and
minority-owned and operated A/E firms and encorages large business
firms to include small business firms as part of their team. The
Standard Industrial Classification (SIC) cODE IS 8712. A/E firms that
meet the requirements describedin this announcement are invited to
submit a letter of interest and completed Standard Forms 254 for each
firm and a team Standard Form 255 to Billy Davis, Contracting Officer,
National Park Service, Midwest Region, 1709 Jackson Street, Omaha,
Nebraska 68102. Responses must be received before 4:00 p.m., April 3,
2000 in order to be considered for this selection. This is not an RFP.
Any questions pertaining to the above shall be addressed to Billy
Davis at the above stated address.***** Posted 02/18/00 (W-SN426833).
(0049) Loren Data Corp. http://www.ld.com (SYN# 0017 20000223\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|