Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 2,1999 PSA#2487

U.S. Department of Labor, ETA, Division of Contracting Services, 200 Constitution Ave., NW, Room S-4203, Washington, DC 20210

Z -- PY'97 FIRE RATED ASSEMBLIES AT VARIOUS BUILDINGS AND CORRECT VENTILATION FLAWS AT BUILDING 3 AT THE RED ROCK JOB CORPS CENTER LOCATED IN LOPEZ, PENNSYLVANIA SOL IFB-00-DCS-06 DUE 020399 POC Mrs. Serena Boyd 202-219-8706 or Richard Hughes 703-516-2224 WEB: IFB-00-DCS-06, http://cbdnet.access.gpo.gov/. E-MAIL: IFB-00-DCS-06, BOYDS@DOLETA.GOV. The project involves the removal and disposal of existing interior and exterior doors hardware and frames and the installation of new doors, hardware and frames. Several door and frame assemblies require fire ratings. The work also includes the removal of interior glazing and frames and the installation of new wire glass and frames. Also, included is the installation of spray-on fireproofing, fire rated walls and a sprinkler system in a mechanical room, removal and disposal of existing air handling and distribution system and install a new heating and air conditioning system for a classroom building. The new system will be a split system with condensing units on the roof. Estimated time for constructio is approximately 250 calendar days to substantial completion. Estimated construction cost range is from $500,000 to $1,000,000. Plans and Specifications will be available on or about December 20, 1999, Only from the office of Levkulic Associates, 101 East Union Street, Pottsville, Pennsylvania 17901. Contact Mr. John Levkulic on (570) 628-2887 for additional information regarding this project. Collect calls will not be accepted. It is emphasized that requests for plans and specifications shall be directed to the A/E firm listed above to ensure proper handling of requests. All requests must be in writing. All requests will be answered on a first-come, first serve basis until supplies are exhausted. For requests made after the supply is exhausted, a non-refundable fee not to exceed the actual cost of reproduction of the IFB documents (to be determined by the Contracting Officer) plus a shipping charge based on individual request (if applicable) will be required in order to obtain the IFB documents. A Pre-Bid Walk-Thru is scheduled for January 13, 2000, at 2:00 p.m. local time. The Bid Opening Date is February 3, 2000, at 2:00 p.m. local time. This is a 100% Small Business Set-Aside Acquisition is 1751 with a Size Standard of $7.0 million. See Numbered Notes(s): 1. Posted 11/30/99 (W-SN404549). (0334)

Loren Data Corp. http://www.ld.com (SYN# 0083 19991202\Z-0002.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page