COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 28,1999 PSA#2464R -- AIR FORCE RESEARCH LABORATORY(AFRL) A-76 STUDY Background "As of
5 Oct 1999: The milestones have been updated for this solicitation. IFB
release is now planned for 20 Oct 99. AS of 1 Oct 1999: Amendment 0006
has been posted to PIXS. As of 14 Sep 1999: Amendment 0005 has been
posted to PIXS. Updated milestones have also been posted. As of 9 Sep
1999: The date for issuance of the IFB will be moved into October.
Updated milestones will be posted next week. As of 2 Sep 1999:
Amendment 0004 has been posted to PIXS. Also, the Frequently Asked
Questions have been updated to include Nrs. 115 thru 119. AS of 26 Aug
1999: The Frequently Asked Questions have been changed to add two
questions, Nrs 113 and 114. As of: 24 Aug 1999 Amendment 0003 has been
posted to PIXS. This Amendment is as a result of concerns by some
offerors. We are amending the PWS to include additional information
pertaining to workload estimates. As of: 5 Aug 1999 a. Amendment 0002
has been posted to PIXS. b. When sending email messages to Colleen
Albertson, the new address is: Colleen.Albertson@wpafb.af.mil A new
email system has been installed. This should eliminate the previous
problems of not being able to read some of the emails. c. The
milestones have also been updated. As of : 29 July 1999 Amendment 0001
has been posted to this PIXS site. AS of: 28 July 1999 The Frequently
Asked Questions have been updated with two minor changes: Nr. 100
response, change AFRL/LMCA to AFRL/HE LMCA Nr. 103, question, change
Firmed to Firm An amendment will be posted approximately 29 July 99. As
of 27 July 1999 The questions have been loaded under ""Frequently Asked
Questions."" This includes the questions previously loaded under
""Draft PWS Questions and Responses"" and the additional questions that
have recently been asked. WE ARE NOT ACCEPTING ADDITIONAL QUESTIONS.
HOWEVER, IF THESE RESPONSES ARE NOT SUFFICIENTLY CLEAR, PLEASE NOTIFY
COLLEEN ALBERTSON VIA FAX (937) 257-3926 OR CALL (937) 257-6147, x4217
BY CLOSE OF BUSINESS 28 JULY 1999. As of: 26 July 1999 Please Note:
Atch 4 has been loaded again to this PIXS site. No changes have been
made to the original document. AS of 20 July 1999 Documents listed at
the bottom of this page are revised often. Please continue to check the
page frequently for updates. Revised documents will be annotated with
a red NEW to the left. AS OF 23 JUNE 1999 Request for Technical
Proposal (Step 1) has been posted to PIXS. This consists of a letter
and nine attachments. Attachment 9 is the PWS. Questions and responses
to the draft PWS have also been posted. An updated schedule will be
posted on 24 June 1999 as a separate file. Technical proposals are due
9 Aug 1999. AS OF 28 MAY 1999 A DRAFT PWS IS NOW BEING RELEASED. IN
ADDITION TO ANY OTHER COMMENTS YOU MAY WANT TO PROVIDE, WE ARE
SOLICITING COMMENTS FROM POTENTIAL OFFERORS WITH REGARD TO THE ADEQUACY
OF THIS PWS WHICH WE INTEND TO PROCURE AS A FIXED PRICE CONTRACT.
DISCLAIMER: THIS DRAFT PWS DOCUMENT IS BEING MADE ACCESSIBLE FOR THE
LIMITED PURPOSE OF INDUSTRY REVIEW AND COMMENT. THE GOVERNMENT RETAINS
ITS RIGHT TO CHANGE OR REVISE ANY PORTION OF THIS DOCUMENT. THE
PUBLICATION OF THIS DRAFT CREATES NO NEW LEGAL RIGHTS IN THE USER,
INCLUDING BUT NOT LIMITED TO, RELIANCE ON ANY PART HEREOF. ACCESS TO
AND USE OF THIS DOCUMENT CONSTITUTES ACCEPTANCE OF THIS DISCLAIMER.
PLEASE SUBMIT ALL COMMENTS OR QUESTIONS REGARDING THIS DRAFT PWS TO
COLLEEN ALBERTSON BY EMAIL AT albertcr@pkwsmtp.wpafb. af.mil OR FAX TO
(937) 257-3926 BY 11 JUNE 1999. AS OF 21 MAY 1999 SEE NOTE BELOW AS OF
30 APRIL 1999 MILESTONES FOR AFRL A-76 STUDY PreSolicitation Synopsis
30 Apr 99 Issue Request for Tech Proposal (Step 1) 16 Jun 99
Preproposal Conference/Site Visit 10 Jul 99 Proposals Received 3 Aug 99
Discussions Concluded 25 Aug 99 * Final Tech Eval Concluded 01 Sep 99
* Issue Invitation for Bid (Step 2) 07 Sep 99 * Bid Opening and
Preliminary Decision 07 Oct 99 * Contract Award/Solicitation Cancelled
02 Dec 99 * NOTE: The above are target dates and are subject to
change. Check this schedule for any updates. * NOTE: 21 MAY 1999 These
dates have slipped. Will post the new schedule within one week. *
NOTE: 28 MAY 1999 These dates will be revised within two weeks. 17.
PRESOLICITATION NOTICE: Period of Performance is 1 Oct 2000 -- 30 Sep
2001. Four one-year options may be awarded. SIC 8711, Size Standard is
$20,000,000.00. This acquisition is a Small Business Set-Aside. Only
companies, including their affiliates, with an average annual receipt
of $20,000,000.00 or less during the last three completed fiscal years
are considered small. An Award will be made using Two-Step Sealed
Bidding procedures in accordance with FAR 14.5. Under Step 1, offerors
are to submit a technical proposal only. Price or cost estimates are
NOT included in Step 1. An Invitation for Bid will be issued under Step
2 to those firms whose technical proposals have been determined to be
acceptable. The Request for Technical Proposal (RFTP) and Performance
Work Statement (PWS) will be posted on the ASC Preaward Information
Exchange System (PIXS) at Wright-Patterson Air Force Base, Ohio
(http:www.pixs.wpafb.af.mil/pixslibr/99B9003/99B90 03.asp). To have
your firm placed on the source list for this solicitation, see the
above web site for direction. Also at this website, ensure your firm is
registered to receive e-mail for this solicitation" WEB: 99B9003-Air
Force Research Laboratory(AFRL) A-76 Study,
http://www.pixs.wpafb.af.mil/pixslibr/99B9003/99B9003.asp. E-MAIL:
albertcr@pkwsmtp.wpafb.af.mil, albertcr@pkwsmtp.wpafb.af.mil. Posted
10/26/99 (D-SN395159). Loren Data Corp. http://www.ld.com (SYN# 0548 19991028\SP-0009.MSC)
SP - Special Notices Index Page
|
|