COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 4,1999 PSA#2447U.S. Department of Labor, ETA, Division of Contracting Services, 200
Constitution Ave., NW, Room S-4203, Washington, DC 20210 Y -- NEW PHYSICAL FITNESS CENTER SOL IFB-99-DCS-65-JC DUE 111899 POC
Dan Dyer, Architect (617) 338-5350; or Kenneth S. Graves, Contract
Specialist (202) 219-8706, Ext. 123 WEB: IFB-99-DCS-65-JC,
http://cbdnet.access.gpo.gov. E-MAIL: IFB-99-DCS-65-JC,
kgraves@doleta.gov. This project consists of the construction of a
24,000 sq. ft. physical fitness center containing a gymnasium,
recreation rooms for activities such as aerobics, weighlifting,
billiards, arts & crafts, a multipurpose room, offices, a learning
resource center, snack bar, and men's and women's shower/toilet/locker
areas at the Westover Job Corps Center located in Chicopee,
Massachusetts. The period of performance for construction is 420
calendar days from receipt of notice to proceed through completion of
the project. The estimated cost range of construction is between
$1,000,000.00 and $5,000,000.00. Initial Plans and Specifications will
be available on October 18, 1999, only from the Architect/Engineer
firm of Miller Dyer Spears, Incorporated, 286 Congress Street, Boston,
Massachusetts 02210. Contact Mr. Dan Dyer (617) 338-5350 for
additional information. Collect calls will not be accepted. It is
emphasized that requests for plans and specifications should be
directed to the A/E firm listed above to ensure proper handling of
requests. Request will be limited to the issuance of one complete set
per request from any interested party. Plans and specifications will be
made available for pick up at the A/E's office, or may be arranged for
delivery at an additional charge. Any additional shipping and/or
handling charges must be pre-paid and COD request will not be accepted.
Requests must be in writing and will be answered on a first-come,
first-serve basis until the initial supply is exhausted. For additional
sets requested by interested parties, or for requests made after the
initial supply is exhausted, a non-refundable fee not to exceed the
actual cost of reproduction of the IFB documents, plus a shipping
charge based on each individual request (if applicable) will be
required in order to obtain the IFB documents. Pre-Bid Walk-Thru is
scheduled for November 4, 1999, at 10:00 a.m. (local) at the Center.
This will be the only opportunity to review the job site prior to
submission of bids. Bid-Opening is scheduled for November 18, 1999, at
11:00 a.m. (local) at the A/E's office. [NOTE: THIS IS A 100% SMALL
BUSINESS SET ASIDE ACQUISITION. The Standard Industrial Classification
(SIC) code for this acquisition is 1542. The Small Business Size
Standard is $17.0 million.] Posted 09/30/99 (W-SN386655). (0273) Loren Data Corp. http://www.ld.com (SYN# 0090 19991004\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|