|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 13,1999 PSA#2430Commanding Officer, NCTAMS LANT, 9625 Moffett Avenue, Norfolk, VA
23511-2784 70 -- ATM TEST EQUIPMENT SOL n68057-99-Q-0007 DUE 091699 POC Sylvia W.
Sutton 757-445-4096, SuttonS@nctamslant.navy.mil E-MAIL: click here to
contact the contract specialist, SuttonS@nctamslant.navy.mil. ATM TEST
EQUIPMENT The Department of Navy information technology architectures
evolve around asynchronous transfer mode (ATM). ATM technologies
converge voice, video, and data. The ATM equipment shall perform
detailed tests that measure performance, standard conformance, and
quality of service. The listed equipment; hardware/ software enables
the Technical Support Team to access, evaluate, analyze and test the
latest ATM networking technology releases. EQUIPMENT SHALL CONTAIN: a.
Modular chassis with up to 16 slots; 4 slot minimum b. Ethernet
10baseT remote control access c. Windows NT Based Controller Software
d. 622MBps (OC-12) and 155MBps (OC-3) generation & analysis e. ATM Cell
generation capabilities -- AAL0, AAL1, AAL2, AAL3/4, AAL5 f. Able to
generate up to 7 independent streams of mixed Constant Bit Rate (CBR)
& Variable Bit Rate (VBR) cell traffic per port g. Traffic shaping
capability on all cell streams h. UNI 3.0/3.1/4.0 SVC signaling
emulation capability i. OAM Cell generation & analysis j. Quality of
Service (QoS) Analysis for 2000+ simultaneous cell streams at FULL LINE
RATE 100% utilization. QoS Performance Measurements to include: Cell
sequence number Transmission time stamp Single cell or cross cell PRBS
pattern Payload CRC k. Automatic sub stream filtering by VPI/VCI and
AAL type l. Substream Analysis and Statistics to include: Cell count,
cell loss and cell loss ratio Misinsertion cell count and rate Errored
cell count and rate Block count and severely erred block count and
ratio Out-of-sequence cell count Mean, minimum, and maximum cell
transfer delay Mean, minimum, and maximum cell interarrival time Cell
transfer capacity and rate PRBS bit error count and rate PRBS synch
error count Number of outages, longest outage, accumulated outages
CLP=1 cell count and ration AAL CPCS PDU and error counts m. Protocol
decodes for TCP/IP, LANE, PNNI, SVC Signaling, & Frame Relay n. Support
OC-48 -2.4Gbps o. Supports Frame Relay DS-3 frame generation & analysis
p. Supports Gigabit Ethernet frame generation & analysis q. Supports
ABR emulation & analysis r. The contractor shall certify all
hardware/software and/or accessories offered for this requirement are
year 2000 compliant for Information Technology (IT) required to perform
date/time processing involving dates subsequent to 31 Dec 1999. s.
Vendor shall provide a 1 year warranty that covers hardware and
software; parts and labor by mail back services. VENDORS THAT CAN
SUPPLY THIS OR EQUIVALENT EQUIPMENT SHALL SUBMIT THEIR OFFERS INCLUDING
TECHNICAL INFORMATION BY SEPTEMBER 16, 1999 BY 4:00 P.M. EDT. Posted
09/08/99 (W-SN377942). (0251) Loren Data Corp. http://www.ld.com (SYN# 0467 19990913\70-0002.SOL)
70 - General Purpose ADP Equipment Software, Supplies and Support Eq. Index Page
|
|