Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 3,1999 PSA#2425

ASC/PKWOEB 1940 ALLBROOK DRIVE, STE 3, BLDG 1, AREA C WRIGHT-PATTERSON AFB OH 45433-5309, 45433-5309

Z -- REPLACE HOSPITAL WATER VALVES PHASE 3 -- BASE HOSPITAL, WPAFB OH SOL F33601-99-B-0016 DUE 092799 POC Linda Pitarys,(937) 257-6571, ext. 4126 WEB: 99B0016-Replace Hospital Water Valves Phase 3 -- Base, http://www.pixs.wpafb.af.mil/pixslibr/99B0016/99B0016.asp. E-MAIL: Linda.Pitarys@wpafb.af.mil, Linda.Pitarys@wpafb.af.mil. Background "1 Sep 99 This solicitation package has been reloaded and all technical difficulties have been worked out. You should now have no problem downloading the drawings. NOTE: To view drawings, you need to have Source View Software set up and you need to view drawings through the Source View Reader.exe. (Open the SVR.exe, click on file open, highlight project number and click OK). Amendment No. 1 is also issued to attach revised Wage Decision OH-99-29 (Mods 0-7). Bid opening remains 24 Sep 99. Thank you for your cooperation. 25 Aug 99 NOTE: Solicitation package uploaded to PIXS. 19 Aug 99 NOTE: This project was originally posted under F33601-99-B9008 due to an administrative error. The solicitation number is the only change; all other information remains unchanged. PRE-SOLICITATION NOTICE: Project Number 958001A1, Solicitation Number F33601-99-B0016. Replace Water Valves, Phase III in connection with the Life Safety Upgrade at the USAF Medical Center, WPAFB OH in accordance with Project 958001A1. Hard copies of the solicitation will NOT be provided. You may download and print the file from the World Wide Web (WWW) at: http://www.pixs.wpafb.af.mil.pixs.page2.asp The project scope consists of furnishing all labor, appliances, devices and materials to perform all operations necessary in connection with Replacing Water Valves in connection with the Life Safety Upgrade, Phase III at the USAF Medical Center, including removals and miscellaneous work IAW the specifications and drawings of WP 958001A1. Estimated cost of proposed acquisition is between $100,000 and $500,000. Refer to Local Notes B and H. ""Mr. Stephen J. Plaisted has been appointed as Ombudsman to hear concerns from offerors, or potential offerors, during the proposal development. The purpose of the Ombudsman is to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel. Existance of an Ombudsman does not diminish the authority of the program director or the source selection process and, therefore, for routine matters on individual solicitation, please contact Linda Pitarys, ASC/PKWOEB, (937) 257-6571, ext. 4126. When requested, the Ombudsman will maintain strict confidentiality as to the source of the concern. Should you desire to contact the Ombudsman, Mr. Plaisted can be reached at (937) 255-9095, ext. 232."" Contractor must be registered in the CCR prior to award for solicitations issued after 31 May 1998. Tel: 1-888-CCR-2423 FAX: 1-703-696-0213. Every solicitation issued after 31 May 1998 must include this clause at DFARS 252.204-7004. ""Required Contract Registration."" DUNS/CCR Web Site: http://ccr.edi.ids Solicitation No. F33601-99-B9008, Project No. 985001A1 Attachment to synopsis: NOTES: 1. The solicitation, specifications, and drawings will be available on the WWW on or about 25 Aug 99. 2. There is no fee for this solicitation. 3. There are approximately 15 pages of the solicitation and 155 pages of the specification, and 58 drawings. 4. One hard copy of the solicitation will be available for review in Build 260, Area C, Wright-Patterson AFB OH. 5. A registration page will be attached to the web site. You are NOT required to register, however, when you register, you will receive notice of any changes to the solicitation. 6. You shall provide a signed copy of the SF 1442 at the time and place specified in the solicitation for bid opening. Bids will be publicly opened. Sealed envelopes containing bids shall be marked to show the bidder's name and address, the solicitation number, and the date and time bids are due. 7. Contractors that are Debarred, Suspended, or Proposed for Debarment are excluded from receiving contracts. Agencies also shall not consent to subcontract with these contractors. Bids prepared by Debarred, Suspended or otherwise ineligible contractors are at the risk and expense of the contractor. " Posted 09/01/99 (D-SN375403). (0244)

Loren Data Corp. http://www.ld.com (SYN# 0160 19990903\Z-0001.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page