|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 18,1999 PSA#2412U. S. ARMY CORPS OF ENGINEERS, 2000 FT. POINT RD, CONTRACTING DIVISION,
P. O. BOX 1229, GALVESTON TX 77553-1229 Z -- GULF INTRACOASTAL WATERWAY, MAIN CHANNEL IN MATAGORDA BAY,
MATAGORDA COUNTY, TEXAS, DREDGING SOL DACW64-99-B-0037 DUE 100599 POC
Contract Specialist Lucy Smith (409) 766-3845 Contracting Offier Carol
A. Devany (409) 766-3852 (Site Code DACW64) WEB:
www.swg.usace.army.mil/ct, www.swg.usace.army.mil/ct. E-MAIL:
lucille.r.smith@usace.army.mil, lucille.r.smith@usace.army.mil. The
work consists of the removal of approximately 363,000 cubic yards of
dredged material comprised of maintenance material and new work virgin
material (hard packed sands and clay) from 11,374 feet of project
channel with variable widths of 125 to 225 feet to required depths of
16 feet (below mean low tide) and 2 feet of allowable overdepth. The
main channel will be widened to widths varying from 50 to 100 feet.
Disposal is in partially confined placement area on Sundown Island.
Approximately 3,000 lineal feet of 8-10 feet diameter geotube will be
constructed on the northeast side of Sundown Island to help contain the
dredged material. Plans and specifications will be available only in
electronic format on compact disc at no cost. It is the contractor's
responsibility to reproduce a set of contract drawings from this
compact disc. Submit your request via FAX# (409) 766-3010 or via e-mail
to lucille.r.smith@usace.army.mil. Subcontracting goals for the
Galveston District are: 61.2% Small Business; 9.1%Small Disadvantaged
Business; and 4.5% Woman-Owned Business. Price range for this work is
between $1 million and $5 million Posted 08/16/99 (A-SN368118). (0228) Loren Data Corp. http://www.ld.com (SYN# 0128 19990818\Z-0012.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|