COMMERCE BUSINESS DAILY ISSUE OF JULY 30,1999 PSA#2399Department of the Air Force, Direct Reporting Units, 10 ABW/LGC, 8110
Industrial Drive, Suite 200, USAF Academy, CO, 80840-2315 58 -- CLOSED CIRCUIT VIDEO SYSTEM -- USAF ACADEMY SOL F0561199R0011
DUE 080299 POC Scott Walker, Contracting Specialist, Phone (719)
333-6081, Fax (719) 333-4404, Email scott.walker@usafa.af.mil -- Bruce
Taylor, Contracting Officer, Phone (719) 333-2869, Fax (719)333-4747,
Email WEB: Visit this URL for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=M&ProjID=F0561199R0011
&LocID=479. E-MAIL: Scott Walker, scott.walker@usafa.af.mil.
F05611-99R-0011 28 Jul 99 Reason for Amendment: To make changes to the
combined synopsis/solicitation and for technical clarification. This
amendment is being issued as indicated in amendment 0001 released 27
Jul 99, to provide additional information and technical clarification
as a result of questions received as a result of this combined
synopsis/solicitation. (a) Reference Drawings AF 740-674-00, Project
No. XQPZ954007, sheet 1G05, Interior Electrical Legend. Two (2) symbols
have been used to identify CCTV Cameras; the blacked out camera symbol
represents a new camera location, which requires a new camera, new
conduit and new wire. The transparent camera symbol represents an
existing camera location, requires new conduit and wire from existing
box and new camera. Symbols are to be interpreted as referenced above
unless noted otherwise. (b) Sheet E503 Camera location at East End of
room 122 new addition. Camera symbol used is incorrect, correct symbol
should indicate new camera. ( c ) Sheet E503 camera at North East end
of Room 142 symbol is incorrect. Camera at this location has been
deleted. A new Camera is required at the North West corner of the
adjacent Room 143. (d) Conduit requirements; It is assumed all wiring
will be signal or low voltage power. Since this is a monitoring system
as opposed to a security system, full conduit is not required. Wiring
in walls, chases and ceilings dosen't require conduit. Wiring exposed
on wall or ceiling surfaces, such as from ceiling to camera, shall be
enclosed in rigid or flex steel conduit, 12" min. (e) Sheet E504, Room
230, camera symbol is incorrect. Camera located in South side should
indicate a new camera at the existing location. (f) Sheet E502, Room
140-Gym. Height of new location North East corner should be 20' above
finished floor. Camera symbol at South East corner is incorrect. Should
indicate new camera symbol in old location and should be mounted 20'
above finished floor. (g) Sheet E502 Room 141 Pool. New camera at North
East Corner should be mounted at 15' above finished floor and under
soffit. Existing camera symbol at South West corner is incorrect,
symbol should indicate new camera at existing location, pressurized.
(h) Sheet E502, Room G40, New Gym. Camera symbols are incorrect. Symbol
should indicate new camera at locations; cameras should be mounted at
20' above finished floor. (i) Pressurized Enclosures, the number of
pressurized enclosures are hereby changed to read 2 ea in lieu of 4 and
located in pool area. (j) Camera Enclosures. The number of enclosures
required is hereby changed to read 6 enclosures are required. Areas
which require enclosures are 2 in pool; pressurized, and 2 in each gym;
protected. (k) All camera lenses are to be selected by contractor for
optimum lighting, distance covered, viewing angle and resolution for
both monitor and recording purposes. (l) Pressurized camera housings;
two units are required and they are located in the pool area. (Ref.
Sheet E503). (m) Protective camera enclosures. Four are required; Two
in room 140 and two in G40. (Ref. Sheet E502). (n) Camera power supply.
An approved alternate method shall be a single power supply for all
cameras, to be run in with signal cable between the cameras and the
control room. (o) All existing cameras mentioned in the solicitation
requiring removal, have been removed; therefore the solicitation is
hereby changed to read zero cameras require removal existing components
are to be used if possible. (p) The beginning performance date of this
contract is hereby changed to read on or about 13 Aug 1999. Contractor
must have adequate resources to begin and complete the electrical
wiring portion of this contract within the time allowed by the General
Contractor assigned to the overall construction project. Posted
07/28/99 (D-SN360244). (0209) Loren Data Corp. http://www.ld.com (SYN# 0343 19990730\58-0002.SOL)
58 - Communication, Detection and Coherent Radiation Equipment Index Page
|
|