|
COMMERCE BUSINESS DAILY ISSUE OF JULY 19,1999 PSA#2390USDA Forest Service, Sierra National Forest, 1600 Tollhouse Road,
Clovis, CA 93611-0532 Y -- RAINBOW POOL BRIDGE SOL IFB-R5-15-99-38 DUE 090199 POC Jerry
Usrey, (209) 532-3671 or Patrick Gallegos, (559) 297-0706 Extension
4830 This project, located on the Stanislaus National Forest, consists
of the excavation for bridge structure and the placement of structural
concrete. The placement of 62 feet long prestressed concrete bridge and
hardware. There is a minor quantity of aggregate base and hot
bituminous pavement to be placed. The project has an option of
construction of concrete stairs. Desired start work date is September
13, 1999. The estimated price range is between $100,000 and $150,000.
There will be a $25.00 charge for the plans, drawings and maps. Posted
07/14/99 (W-SN353987). (0195) Loren Data Corp. http://www.ld.com (SYN# 0275 19990719\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|