Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 14,1999 PSA#2387

IDAWY Contracting Center USFS, Federal Building -- Room101, 250 South Fourth Avenue, Pocatello, ID 83201

Y -- SALMON RIVER ROAD STABILIZATION AT DEADWATER, SALMON & CHALLIS N.F.'S SOL R4-IDAWY-99-3 DUE 091399 POC Tammy Smith, 208-236-7584 E-MAIL: to request solicitation, tsmith/r4_caribou@fs.fed.us. This project consists of design and construction of four retaining walls to stabilize the Salmon River Road and the bank of the Salmon River in the Deadwater reach. The four walls will have a combined length of 230 m. The fill slope will be reconstructed and any pavement disturbed during construction will be patched. The entire segment from the beginning of the first wall through the end of the last wall will then be overlayed with a 75 mm lift of hot asphalt concrete. The project site may be reached by driving west from North Fork, Idaho, along the Salmon River Road (#60030) approximately 3.5 miles. Estimated price is between $500,000 and $1,000,000. Estimated start work date is October 12, 1999, with completion time of 60 days. Requests for the solicitation may be faxed to 208-236-7503. Posted 07/12/99 (W-SN353018). (0193)

Loren Data Corp. http://www.ld.com (SYN# 0140 19990714\Y-0033.SOL)


Y - Construction of Structures and Facilities Index Page