|
COMMERCE BUSINESS DAILY ISSUE OF JULY 8,1999 PSA#2383U.S. Department of Labor, ETA, Division of Contracting Services, 200
Constitution Ave., NW, Room S-4203, Washington, DC 20210 C -- ARCHITECTURAL AND ENGINEERING DESIGN SERVICES AT THE HARTFORD JOB
CORPS CENTER LOCATED IN HARTFORD, CONNECTICUT. SOL JC-16-99 DUE 080999
POC Contact, Ms. Marion Carter (202) 219-8706 ext. 117 WEB: JC-16-99,
http://cbdnet.access.gpo.gov. E-MAIL: JC-16-99, carterm@doleta.gov.
This project involves A/E services for design and construction
administration services at the Hartford Job Corps Center located in
Hartford, Connecticut for a new Job Corps Center approximately 60,160
gross square feet. The new center shall be conventionally constructed
with pitched roofs and will include space for education, vocational,
administration/medical-dental, cafeteria, recreation, child care and
storage. The new center shall also include miscellaneous site
improvements such as utility installation site/security lighting,
sidewalks, and landscaping. The estimated construction cost range is
more than $10 million. Required disciplines: Structural, Civil,
Architectural, Mechanical (HVAC & Plumbing), and Electrical. Firms must
be capable of producing the design documents on AUTOCAD release 12 or
higher. Specifications shall be provided in CSI format and
"WordPerfect" compatible. Total Design Time is 20 calendar weeks,
including time for submittal review. Firms that meet the requirements
described in this announcement are invited to submit one copy of a
completed SF-255 (Architect-Engineer and Related Questionaire for
Specific Projects) to include brief resumes of key personnel expected
to have major responsibilities for the project. One current copy of
SF-254 is required for the prime to include projects related to the
type and nature of work for which the firm was responsible, and one
copy of SF-254 for each of its individual consulting firms, if
applicable. The SF-255 and SF-254's are to be submitted even if they
are currently on file. Facsimile copies will not be accepted. Only
firms which submit the forms by the deadline date of August 9, 1999
will be considered for review of qualifications. Failure to submit
SF-255 and SF-254's will render the submission unacceptable. Pertinent
factors for consideration of qualifications, listed in order of
importance, for the Project Team, are (1) Qualifications of Assigned
Project Personnel, which considers design capability, project
management skills, and construction administration capability; (2)
Specialized Experience of Assigned Project Personnel; (3) Capacity to
Perform Work in the Required Time; (4) Past Performance on contracts
with Government agencies and private industry in terms of cost control,
quality of work, and compliance with performance schedules, for
similiar type projects, including past Job Corps Center projects, if
applicable; (5) location (preference shall be given to Project Team
located in the general geographical area of the project, with knowledge
of the locality of the project); and (6) Energy Efficiency/Waste
Reduction Capabilities. Applicants are required to include a list of
three references with telephone numbers and names of contact persons
with their submittal. The Project Teams considered the most highly
qualified will have references checked. Project Teams still considered
the most qualified following the references checks will be
interviewed. Applicants should include the Solicitation No. (JC-16-99)
of this CBD Notice with the location/center name in Block No. 1 of the
SF-255. Women-owned, Minority-owned and Small-disadvantaged business
concerns are encouraged to submit. This is a 100% Small Business
Set-Aside. The SIC Code is 8712 and the Small Business Size Standard is
$4.0 million. The firm should indicate in Block 10 of the SF-255 that
it is a small business concern as defined in the FAR. THIS IS NOT A
REQUEST FOR PROPOSAL. See Numbered Note(s): 1. Posted 07/06/99
(W-SN350467). (0187) Loren Data Corp. http://www.ld.com (SYN# 0019 19990708\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|