Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 25,1999 PSA#2375

United States Air Force, Air Force Space Command, 21CONS (Bldg 365), Specialized Flight-IT, O&M, Tech Serv, IT Resources, 135 E ENT Ave STE 101, Peterson AFB, CO, 80914-1385

D -- Y2K COMPLIANCE UPGRADE FOR SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM SOL F0560499QM001 DUE 072199 POC Jim Sechrist, Contract Specialist, Phone (719) 556-6805, Fax (719) 556-4756, Email Jim.Sechrist@spacecom.af.mil -- Barry Snyder, Contract Specialist, Phone (719) 556-4079, Fax (719) 556-4756, Email WEB: Visit this URL for the latest information about this, http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&;ProjID=F0560499QM001 &LocID=532. E-MAIL: Jim Sechrist, Jim.Sechrist@spacecom.af.mil. Statement of Work For the 821st SPTS/CE Power Plant 1.) Contractor shall provide all labor, equipment, parts, tools and equipment necessary to upgrade the existing Supervisory Control and Data Acquisition System (SCADA) in the 821st Civil Engineer Power Plant, Building 433. Contractor shall furnish and install two (2) Dell P6400 or (equal) faster, Intel Pentium CPU computers. Upgrade existing system to a 32 bit, NT based software which includes the latest version of Microsoft windows NT, Intellution FIX 32 SCADA Software Development system upgrade, Intellution FIX 32 SCADA software Run-time system upgrade and Intellution FIX ESS. The contractor will be responsible for loading existing Supervisory Control System (SCS) database on to the new computers and run Intellution Version 7.0 and test to ensure requirements have been completed and are operational. 2.) Site Testing: The contractor shall provide all personnel, equipment, instrumentation and supplies necessary to perform all site testing. The contractor will provide the 821st Civil Engineer Power Plant with a test plan for approval. The plan will include Y2K compliance, verify operations of all systems in the specified failure modes upon SCS failure or loss of power. Power outages needed to test system should be scheduled well in advanced of any required downtime. 3.) Training Requirements: The contractor shall conduct hands-on training to designated Power Plant personnel on any changes made to the system that will affect any mode of operation. The contractor shall provide hands-on training to designated Power Plant personnel on the upgraded system hardware and software. The contractor and 821st Civil Engineer will determine appropriate training. 4.) Site Visit: A Site visit will be held on 7 July 1999 at 0900. Contractors will meet in the SBIRS Visitors Center no later than 0815 on this date. If you are going to attend please fax the information listed below to SSgt Sechrist at (719) 5564756 by 16:30 hrs on 28 Jun 99. a.) Name(s) of persons wanting access to the Power Plant b.) Social Security Number c.) Company they represent d.) Date of birth e.) Place of birth f.) Visit date(s) g.) Citizenship If you have any questions in regards to this statement of work please fax them with your information about the site visit. This will permit us to get answers prior to the site visit. 5. Security Requirements: The contractor shall comply with all the applicable security requirements for entry into the controlled area within the fence. In order to visit or perform work inside the fence area, the contractor must provide the following information: a.) Name(s) of persons wanting access to the Power Plant b.) Their Social Security number c.) Company they represent d.) Date of birth e.) Place of birth f.) Visit Dates g.) Citizenship 6. Closing Date: 21 July 1999 at 1630hrs, Mountain Standard Time. Contractors are required to submit with their proposal technical information pertaining to the computers, price breakdowns for labor and number of hours. Posted 06/23/99 (D-SN346198). (0174)

Loren Data Corp. http://www.ld.com (SYN# 0031 19990625\D-0010.SOL)


D - Automatic Data Processing and Telecommunication Services Index Page