COMMERCE BUSINESS DAILY ISSUE OF MAY 14,1999 PSA#2346Talisman Partners, Ltd., 5460 South Quebec St., Suite 100, Englewood,
Co 80111-1916 M -- PRIVATIZATION UNDER 10 USC 2688, UTILITY SYSTEMS: CONVEYANCE
AUTHORITY AT BARKSDALE AFB, SHREVEPORT, LA. DUE 062399 POC Scott
Beckman or Joel Theis, 303/771-3103 E-MAIL: Email to POC,
sbeckman@talpart.com. The Air Force seeks to identify responsible
potential sources and obtain information in regards to privatization of
utility systems in accordance with 10 USC 2688, "Utility Systems:
Conveyance Authority". The Commander of Barksdale AFB is seeking
interest and information specifically for the potential privatization
of the natural gas distribution system at Barksdale AFB, Louisiana.
OBJECTIVE: Should privatization result, the ownership of the Barksdale
AFB natural gas distribution system, operation and maintenance and
obligation to continue to provide utility service for an indefinite and
ongoing period will transfer to a utility service provider. All
responsibility for maintaining reliable utility service, including such
items as environmental compliance, maintenance costs, major system
renovations, construction, equipment, manpower and overhead costs will
become the utility service provider's responsibility. It is intended
that the privatization will ultimately reduce the Air Force's
life-cycle costs for operating and maintaining utility systems and
services. SYSTEM DESCRIPTIONS: The following is provided only to give
an approximation of the size, scope and general description of the
system(s). Any numbers should only be used for estimating purposes. The
following system parameters are approximations: Base Size: 21,802 acres
or 34.07 square miles with 773 buildings. 429 existing family housing
units. In addition the following housing units are presently under
construction and due for completion in the near future. 172 housing
units on main base, 128 housing units on east Reservation. TOTAL: 729
family housing units. Natural Gas System: 37 linear miles of main
distribution and lateral system on main base. 12.3 miles of main
distribution and laterals in Family Housing Area. Natural Gas
consumption (FY 98): 2,156,001 Ccf. Residential Usage: Approx. 26% (FY
98). Commercial/Industrial Usage: 74% (FY 98). PROCEDURES: This
request to interested parties is for gathering information and is a
required component of a systematic process to evaluate the interested
parties under the Air Force's utilities privatization program. In order
to minimize costs both to potentially interested parties and the
government, this notice is being issued to determine the interest and
feasibility of proceeding with a formal request for proposals. Should
insufficient credible interest be identified for a privatization
action, it is highly likely that no formal solicitation will be issued.
SHOULD INTEREST BE DETERMINED SUFFICIENT, A FORMAL REQUEST FOR
PROPOSALS MAY BE FORTHCOMING. Small Business interests shall note the
FAR Part 19 Standard Industrial Codes (SIC) and Size Standards for the
utility systems identified in this announcement. Some, all, or any
combination of the following may apply. SIC/SS: 4911/4Million (M)
Megawatt hours, 4922/$5M, 4923/$5M, 4924/500, 4925/$5M, 4931/$5M,
4932/$5M, 4939/$5M, 4941/$5M, 4952/$5M, 4953/$6M, 4959/$5M, 4961/$9M,
4971/$5M. REQUESTED RESPONSE: Interested parties should provide a
statement of interest on company letterhead (not to exceed 20 pages in
length). The statement should include as a minimum the following
criteria: (1) capability and experience in ownership, operation and
maintenance of similar utility systems, (2) financial capacity to
purchase, expand and operate the utility systems; (3) statement
detailing the understanding of the obligation to serve in regards to
continuous utility service; (4) statement detailing the legal right to
serve, own, operate, and maintain utility systems within state laws
and an understanding of any applicable federal, territorial and local
utility laws, regulations or franchise requirements affecting utilities
in the territory, and capability of complying with such requirements;
and (5) statement detailing the understanding of federal, territorial,
and local environmental laws and regulations and familiarity and
experience with environmental compliance procedures and regulations for
the State of Louisiana and the U. S. Environmental Protection Agency.
Elaborate proposals or pricing information is neither required nor
desired. Under no circumstances will cost data for the existing systems
be provided. Any innovative and new conceptual ideas to achieve the
stated objective are encouraged. If a site visit and the provision of
additional data are later determined necessary, notification will be
provided by way of an amendment to this announcement. It should be
noted that RFIs for different utility systems may be issued in the same
time frame. A separate response to each RFI is required. The point of
contact is Scott Beckman or Joel Theis, 303/771-3103. Posted 05/12/99
(W-SN330651). (0132) Loren Data Corp. http://www.ld.com (SYN# 0045 19990514\M-0001.SOL)
M - Operation of Government-Owned Facilities Index Page
|
|