COMMERCE BUSINESS DAILY ISSUE OF MAY 12,1999 PSA#2344United States Air Force, Pacific Air Forces, 36 CONS, Unit 14040,
Anderson AFB, APO Guam, ., 96543-4040 Y -- CONSTRUCTION OF STRUCTURES AND FACILITIES SOL 990510Y DUE 061599
POC Norma Reyes, Contracting Officer, Phone (671)366-2921, Fax
(671)366-5678, Email norma.reyes@andersen.af.mil WEB: Visit this URL
for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=R&ProjID=990510Y&LocID
=644. E-MAIL: Norma Reyes, norma.reyes@andersen.af.mil. The Air Force
seeks to identify responsible potential sources and obtain information
in regards to privatization of utility systems in accordance with 10
USC 2688, Utility Systems: Conveyance Authority. The Commander of
Andersen AFB is seeking interest and information specifically for the
potential privatization of the electrical distribution utility system
at Andersen AFB, Guam. OBJECTIVE: Should privatization result, the
ownership of Andersen AFB_s electrical distribution utility system,
operation and maintenance and obligation to continue to provide utility
service for an indefinite and ongoing period will transfer to a utility
service provider. All responsibility for maintaining reliable utility
service, including such items as environmental compliance, maintenance
costs, major system renovations, construction, equipment, manpower and
overhead costs will become the utility service provider_s
responsibility. It is intended that the privatization will ultimately
reduce the Air Force_s life-cycle costs for operating and maintaining
the electrical distribution utility system and service. SYSTEM
DESCRIPTIONS: The following is provided only to give an approximation
of the size, scope and general description of the electrical
distribution utility system at Andersen AFB. Any numbers may be used
for estimating purposes only. Andersen AFB cover an area roughly 8
miles wide and 2-4 miles long (24.5 square miles). The electrical
distribution utility system at Andersen AFB is currently owned by the
Air Force, and operated and maintained by the Navy civilian personnel.
Andersen AFB purchases its electrical power requirements from the Navy
and redistributes the electricity throughout the Base. Andersen AFB_s
electrical distribution utility system includes the following: 1 main
substation, approximately 11.4 circuit miles of overhead primary
distribution line, 20.6 circuit miles of underground primary
distribution line, 15.0 circuit miles of overhead secondary
distribution line, 12.4 circuit miles of underground secondary
distribution line and 31,104 kVA of overhead and pad mounted
transformers. PROCEDURES: This request to interested parties is for
gathering information and is a required component and systematic
process to evaluate the interested parties under the Air Force_s
utilities privatization program. In order to minimize costs both to
potentially interested parties and the government, this notice is being
issued to determine the interest and feasibility of proceeding with a
formal request for proposals. Should insufficient credible interest be
identified for a privatization action, it is highly likely that no
formal solicitation will be issued. SHOULD INTEREST BE DETERMINED
SUFFICIENT, A FORMAL REQUEST FOR PROPOSALS MAY BE FORTHCOMING. Small
Business interests shall note the FAR Part 19 Standard Industrial Codes
(SIC) and Size Standards for the utility systems identified in this
announcement. Some, all, or any combination of the following may apply.
SIC/SS: 4911/4Million (M) Megawatt hours, 4922/$5M, 4923/$5M, 4924/500,
4925/$5M, 4931/$5M, 4932/$5M, 4939/$5M, 4941/$5M, 4952/$5M, 4953/$6M,
4959/$5M, 4961/$9M, 4971/$5M. REQUESTED RESPONSE: Interested parties
should provide a statement of interest on company letterhead (not to
exceed 20 pages in length). The statement should include as a minimum
the following criteria: (1) capability and experience in ownership,
operation, maintenance and construction of similar electrical
distribution utility systems; (2) financial capacity to purchase,
expand and operate the utility system; (3) statement detailing the
understanding of the obligation to serve in regards to continuous
utility service; (4) statement detailing the legal right to serve, own,
operate and maintain utility systems within territorial laws and an
understanding of any applicable federal, territorial and local utility
laws, regulations or franchise requirements affecting utilities in the
territory, and capability of complying with such requirements; (5)
statement detailing the understanding of federal, territorial, and
local environmental laws and regulations and familiarity and experience
with environmental compliance procedures and regulations for the
Territory of Guam and the U. S. Environmental Protection Agency.
Elaborate proposals or pricing information is neither required nor
desired. Under no circumstances will cost data for the existing systems
be provided. Any innovative and new conceptual ideas to achieve the
stated objective are encouraged. If a site visit and the provision of
additional data are later determined necessary, notification will be
provided by way of an amendment to this announcement. It should be
noted that the RFIs for different utility systems may be issued in the
same time frame. A separate response to each RFI is required. The
point of contact is Ms. Norma Reyes, (671)366-2921. Email:
norma.reyes@andersen.af.mil or Posted 05/10/99 (D-SN329387). (0130) Loren Data Corp. http://www.ld.com (SYN# 0136 19990512\Y-0021.SOL)
Y - Construction of Structures and Facilities Index Page
|
|