COMMERCE BUSINESS DAILY ISSUE OF MAY 12,1999 PSA#2344USDA Forest Service, Pacific Northwest Region, 333 SW First Avenue, PO
Box 3623, Portland, OR 97208-3623 Y -- FALLS CREEK STABILIZATION SOL R6-6-99-089 DUE 062899 POC Lois K.
Tate, Contracting Officer (503) 668-1768 FAX (503) 6681763 WEB:
GPO341058, http://www.abc.gov. E-MAIL: Falls Creek Stabilization,
erinagoff@usa.gov. Website URL: http://fs:fed.us/r6/mthood/noca This
project consists of the construction of a riprap revetment wall for
streambank stabilization, installation of underdrain and erosion
control blanket to stabilize roadbed and cutslope. Contractor shall
divert stream around construction site; construct access road for haul
of riprap; construct asphalt-lined ditch and ditch dam; and modify
concrete catch basin. The Desired Start Work Date is July 15, 1999. A
Preposal conference is scheduled for June 15, 1999, 0900, at the Mt.
Hood National Forest Headquarters, 16400 Champion Way, Sandy, Oregon,
with a site visit. The project is located on the Mt. Hood National
Forest, ZigZag Ranger District, Bull Run Watershed, Clackamas County,
Oregon. The Estimated construction range is between $50,000 and
$75,000. Recommended Contract time is 30 Calendar Days. Posted 05/10/99
(W-SN329760). (0130) Loren Data Corp. http://www.ld.com (SYN# 0134 19990512\Y-0019.SOL)
Y - Construction of Structures and Facilities Index Page
|
|