|
COMMERCE BUSINESS DAILY ISSUE OF MAY 6,1999 PSA#2340United States Air Force, Air Education and Training Command, Luke AFB
Contracting Squadron, 14100 W. Eagle Street, Luke AFB, AZ, 85309 Y -- IMPROVE EMCS FOR HVAC SYSTEMS SOL F02604-99-R0008 DUE 070699 POC
Ralph Chavez, Contract Specialist, Phone 623)856-3436 x252, Fax
(623)856-3438, Email ralph.chavez@luke.af.mil -- Anthony McGraw,
Contracts Flight Cheif 56CONS/LGCC, Phone 623 856-3441, Fax 623
856-3438, Email WEB: Visit this URL for the latest information about
this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=F02604-99-R00
08&LocID=509. E-MAIL: Ralph Chavez, ralph.chavez@luke.af.mil. The
following is a summary of work for the improvement of the Energy
Management Control System (EMCS) for Heating Ventilating Air
Conditioning (HVAC) system at Luke AFB. The project is composed of a
base and an option item (if awarded). The base item consists of
upgrading the existing energy management systems in multiple buildings
(approximately 33). The system shall consist of all sensors, automatic
tempature controllers, multiplexers (NCRS), control relays, automatic
valves, automatic dampers, wells, and other necessary control
equipment. All control equipment shall be analog type or direct digital
control, except as noted otherwise, and shall be intergrated into the
existing Central Control Unit (CCU) data base. Base item shall also
consist of upgrading the dynamic color graphic programs in the CCU in
building 343 and intergrating all upgraded new and existing points into
the CCU. All new and existing points shall be accessible through the
common data base. Option item includes upgrading the existing energy
management system in various building generators and lift stations
(approximately 33). This is a request for proposal with a base and an
option item (if awarded). This contract shall include contractor
quality control methods and partnering. The estimated project value is
between 1 million and 5 million. The contract period is 300 days for
the base item and 150 days for the option item (if awarded). The
Government will award a contract using the performance-price tradeoff
technique to the responsible offeror who conforms to the solicitation
requirements and provides the best value to the Government. The option
will be incorporated based on total fund availability once the base
item has been summed up. This solicitation will be unrestricted and
hard copies of the specifications and drawings will not be provided.
Issue date of this solication will be on or about 01 Jun 99. A
pre-proposal conference is tentatively scheduled for 15 Jun 99. The
anticipated closing date for the receipt of proposals is 06 Jul 99.
Note: AZ does not observe daylight savings time. Posted 05/04/99
(D-SN327548). (0124) Loren Data Corp. http://www.ld.com (SYN# 0116 19990506\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|