|
COMMERCE BUSINESS DAILY ISSUE OF MAY 5,1999 PSA#2339Alliant Techsystems Incorporated, Allegany Ballistics Laboratory, P.O.
Box 210, State Route 956, Rocket Center, WV 26726 N -- TURNKEY EQUIPMENT INSTALLATION (UNLOADING/MOVE IN PLACE/COMPLETE
UTILITY HOOK-UP) FOR THERMOPLASTIC PRODUCTION EQUIPMENT SOL ECE-99011
POC Erik C. Eisentrout, 304-726-5376 The primary effort is to provide
all necessary labor, equipment, material, supervision, and incidentals
to provide utilities for Thermoplastic production equipment and
provide turnkey equipment installation including unloading, move in
place. complete utility hook-up, and painting. The cost of the project
is estimated to be between $250,000 and $500,000. Approximate bid date
is on or about July 1, 1999. Plans and specifications will be available
on or about June 1, 1999. Subcontract term will be about 120 calendar
days. Please send FAX (304-726-5264), written, or e-mail
(ERIK_EISENTROUT@ATK.COM) to obtain bid packages. Phone requests for
bid packages will not be accepted. Posted 05/03/99 (W-SN326750).
(0123) Loren Data Corp. http://www.ld.com (SYN# 0062 19990505\N-0001.SOL)
N - Installation of Equipment Index Page
|
|