COMMERCE BUSINESS DAILY ISSUE OF MAY 4,1999 PSA#2338Northern Division, NAVFACENGCOM, 10 Industrial Highway, Mail Stop #82,
Lester, PA 19113-2090 Z -- WATERFRONT CONSTRUCTION AND REPAIRS MULTIPLE AWARD REGIONAL
CONTRACT (MARC) PRIMARILY IN THE STATES OF ME, NH, RI, CT, VT, MA, NY,
PA AND DEL SOL N62472-99-R-0801 DUE 062599 POC Marylou Morgan,
Contract Specialist, Telephone No. 610-595-0831 Fax No. (610) 595-0644.
This is a Modification to update the following information to the
Commerce Business Daily issue of April 2, 1999 PSA #2316 (SYN# 0294
19990402 Z-0042.SOL): Posted 03/30/99 (I-SN342199). (0089). The Request
for Proposal closing date is extended to June 25, 1999 at 2:00 p.m. Up
to three (3) Best Value contractors may be selected for the award of
either the seed project or the award on one of the up to two other
contracts. Selection criteria stated above for all contracts awarded
will be the same criteria as the first selection. Separate contracts
will be awarded to the responsible offerors whose proposals, conforming
to this RFP (Request for Proposal), are considered to be the most
advantageous to the Government as a result of the Best Value
evaluation, price and other factors considered. All evaluation factors
other than price, when combined are approximately equal to price. The
firm offering the proposal considered most advantageous to the
government will receive the seed project, price and other factors
considered. In addition to pricing, award will be based on technical
evaluation such as Relevant Past Performance, Management Approach,
Technical Experience, Experience, Expertise and Qualification and
Phasing, Commitment to Small Business Concerns. The factors set forth
are of equal importance. The seed project will contain 8 options listed
as follows: (1) Furnish and install cathodic protection and pile
coating at Pier 8, (2) Electrical upgrades at Pier 8, including fifth
receptacle, new substations, utility hoods, conduit, wire, and all
incidentals, (3) Replace water and sewer lines; provide electric heat
and demolish steam, fuel oil and diesel oil lines at Pier 8, (4)
Replace water and sewer lines; provide electric heat tracing and
demolish steam line at Pier 10, (5) Provide electrical outlet isolation
at Pier 10, (6) Bid for Option 6 shall be the total price for providing
all work to provide electrical outlet isolation at Pier 31, complete in
accordance with the drawings and specification, (7) Bid forOption 7
shall be the total price for providing all work to replace steam piping
(without pressure reducing stations or condensate return lines) and to
furnish and install one (1) new steam meter at drydock only at Pier
15, complete in accordance with the drawings and specification, (8) Bid
for Option 8 shall be the total price for providing all work to clean
and jacket piles at Pier 15, complete in accordance with the drawings
and specification, (9) Bid for Option 9 shall be the total price for
providing all work to replace water and sewer lines and provide
electric heat tracing at Pier 15, complete in accordance with the
drawings and specification. The funding availability including the
options is $9,600,000.00. The Government reserves the right to award
one contract covering only the initial or seed project identified in
the RFP. The task orders issued under the MARC contract may contain
options. Technical questions concerning this project, can be faxed to
Marylou Morgan at (610) 595-0644. Posted 04/30/99 (I-SN326299). (0120) Loren Data Corp. http://www.ld.com (SYN# 0155 19990504\Z-0014.SOL)