|
COMMERCE BUSINESS DAILY ISSUE OF MAY 3,1999 PSA#2337Contracts Division, Central Puget Sound Regional Transit Authority
(Sound Transit), 1100 Second Avenue, Suite 500, Seattle, WA 98101 C -- ARCHITECTURAL AND URBAN DESIGN SERVICES FOR THE CENTRAL LINK
LIGHT RAIL SYSTEM, STATION DESIGN PACKAGE 2 SOL RFQ/P No. RTA/LR 62-99
DUE 051899 POC Judy Crow, 206-398-5092; Lisa Woicik 206-689-4967 WEB:
Click here for more information on this and other procurements.,
http://www.soundtransit.org/contract.html. E-MAIL: Click here to
contact Sound Transit's Contracts Division., woicikl@soundtransit.org.
The Central Puget Sound Regional Transit Authority (Sound Transit) is
requesting Statements of Qualifications and Proposals from firms
qualified and interested in consultant architectural, landscaping and
urban design services for Station Design Package #2, Capitol Hill
Station and First Hill Station (2 tunnel stations) in coordination with
the civil facilities and systems design for Preliminary Engineering and
Final Design for the Central Link Light Rail system. Sound Transit
believes the best approach for station and urban design would be to not
change architects between Preliminary Engineering and Final Design.
This would facilitate consistency in the design process and
coordination with the local community and cities. The existing civil
engineering contract requires a change of architects at the end of
Preliminary Engineering that will be complete by December 1999. Sound
Transit is responding to concern that the vision, design intent and
community involvement may be hampered if the change of architects
occurs at the completion of Preliminary Engineering. Therefore, the
architectural services for the remaining Preliminary Engineering and
Final Design effort will be awarded through this competitive
procurement process. The architectural services will be contracted
directly with Sound Transit but require coordination with the Civil
Facilities Consultants, both in the remainder of Preliminary
Engineering and Final Design. Architecture firms that have supported
the Conceptual Engineering and initial Preliminary Engineering effort
are not excluded in submitting qualifications and proposals for this
RFQ/P. Interested firms shall obtain a copy of the Request for
Qualifications and Proposals, which outlines the information necessary
to understand the consultant selection process and the required
documentation, by calling (206) 398-5253 or from the Contracts
Division, Sound Transit, 1100 Second Avenue, Suite 500, Seattle,
Washington 98101-3423. Sound Transit intends to award one station
design contract as a result of this procurement for Preliminary
Engineering and Final Design services. This Contract will be awarded
for both phases; however, only Preliminary Engineering will be
authorized initially. For the purpose of this Request for
Qualifications and Proposals (RFQ/P), Preliminary Engineering and Final
Design are to be included in the work approach. Interested firms are
encouraged to attend a pre-proposal meeting that will be held to
discuss this project, the consultant selection process, the schedule,
and elements of the contract. The meeting will be held on May 4, 1999
at 10:00 a.m., in the 4th Floor Board Room of Sound Transit, 1100
Second Avenue, Suite 500, Seattle, Washington 98101-3423. Inquiries
concerning the consultant selection process and any technical questions
should be directed to Judy Crow at (206) 398-5092. Questions concerning
M/W/DBE and EEO requirements should be directed to Glenn Shoate at
(206) 398-5020. Communications with Sound Transit officials other than
those listed above may cause the firm involved to be subject to
disqualification. Posted 04/29/99 (W-SN326132). (0119) Loren Data Corp. http://www.ld.com (SYN# 0020 19990503\C-0004.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|