COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 4,1999 PSA#2276Bureau of Reclamation, Contracts Group, 1150 N. Curtis Road, Suite 100,
Boise, Idaho 83706-1234 46 -- POTABLE WATER TREATMENT EQUIPMENT FOR GRAND COULEE DAM SOL
1425-99-SP-10-14360 DUE 040899 POC Contact Thomas M. Haynes, Contract
Specialist 208-378-5034/D.Scott Shelley Contracting Officer
208-378-5111 WEB: Click here to contact Contract Specialist via e-mail,
thaynes@pn.usbr.gov. The due date for proposals has been changed to 8
April, 1999. The Facility demand, previously listed as 5,000-gpd is
corrected to maximum facility demand of 380,000-gpd. Design,
Manufacture, Furnish, Install and Test Potable Water Treatment
facilities capable of meeting Washington State Department of Health
requirements for surface water (Lake Roosevelt) source. A Firm, Fixed
Price Contract shall be awarded based on best value to the Government.
Solicitation issue date is scheduled for 02/18/99. Proposal due date
is 04/15/99. Award of contract is scheduled prior to 09/01/99. Offerors
responding to this solicitation must provide information showing that
they meet the small business size standard of 500-employees or less.
The standard industrial classification code is 3589. Telephone requests
for this solicitation will not be accepted, requests for this
solicitation must be in writing: U.S. Bureau of Reclamation, Attn:
PN-3708, 1150 North Curtis Road, Suite 100, Boise ID 83706-1234, by
fax: (208) 378-5108, or by E-mail: thaynes@pn.usbr.gov. All Responsible
sources are encouraged to submit a proposal. A Diatomaceous Earth (DE)
filtration system that operates on demand is required. System shall be
semi-automatic. Disinfection shall be post filtration. The government
has only one source for the disinfection portion of this requirement.
In accordance with FAR 6.302-1 the disinfection system shall be model
SAL-80 manufactured by MIOX Corporation, 5500 Midway Park Place,
Albuquerque, NM 87109, Telephone No. (505) 343-0090. The contractor
shall design, furnish, and install detention tanks adequate to meet
code requirements. System shall have fully integrated monitoring, and
control capability. System shall provide suitable warning and alarm
out-puts to facility SCADA system. Site restrictions include: 1. Dry'
waste, suitable for disposal in landfills is acceptable, liquid waste
streams requiring treatment before disposal must be minimized. 2.
Maximum facility demand is 380,000-gpd. 3. Inlet pressure ranges from
100 to 135-psi. 4. System discharge shall be of 350-gpm, at 280-psi. 5.
Facility will be enclosed within a 55-foot by 33-foot by 15-foot high
area. 6. Equipment shall be skid-mounted with no individual foot-print
larger than 15-feet by 20-feet. 7. System shall be simple and
inexpensive to operate and maintain. Work includes design, manufacture,
delivery, installation completed no later than 10/01/00, and
operational testing and reports complete no later than 02/01/01. See
Numbered Notes 1, and 26. Posted 02/02/99 (W-SN293647). (0033) Loren Data Corp. http://www.ld.com (SYN# 0254 19990204\46-0001.SOL)