|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 26,1999 PSA#226955 Contracting Squadron/LGCS 101 Washington Sq., Offutt AFB, NE
68113-2107 S -- TRIM TREES SOL F2560099R0209 DUE 021299 POC Randall D. Carney
402-294-3738 E-MAIL: http://www.55cons.offutt.af.mil,
randall.carney@offutt.af.mil. 1. SCOPE: The work covered by the
Statement of Work includes the furnishing of all labor, equipment,
appliances and materials in performing all operations in connection
with the removal and/or trimming of trees in accordance with the
following provisions and subject to the terms and conditions of the
contract. 2. GENERAL: The work to be performed under this contract will
take place in the Capehart Housing area, Offutt Air Force Base,
Nebraska. Single phase line from pole 901 to pole 924 (approx. 1400
linear ft.). Single phase line from pole 889 to pole 894, (approx. 350
linear ft.). Single phase line from pole 82 to pole 86A, (approx. 400
linear ft.). Single phase line from pole 525 to pole 540, (approx. 800
linear ft.). Single phase line from pole 727 to pole 732, (approx. 300
linear ft.). Single phase line from pole 715 to pole 718, (approx.350
linear ft.). Single phase line from pole 712 to 768, (approx. 400
linear ft.). Single phase line from pole 710 to pole 749, (approx. 850
linear ft.). Single phase line from pole 793 to pole 970, (approx. 800
linear ft.). Single phase line from pole 332 to pole 345, (approx.800
linear ft.) Single phase line from pole328 to pole 348, (approx. 400
linear ft.). Single phase line from pole 303 to pole 350, (approx.750
linear ft.). Single phase line from pole 296 to pole 353, (approx.750
linear ft.). Single phase line from pole272 to pole 356, (approx.700
linear ft.). Single phase line from pole 203 to pole 300, (approx. 1250
linear ft.). Single phase line from pole 185 to pole 237, (approx. 600
linear ft.). Single phase line from pole 191 to pole 242, (approx. 700
linear ft.). Single phase line from pole 194 to pole 261, (approx.600
linear ft.). Two phase line from pole 183 to pole 198, (approx. 1100
linear ft.). Three phase line from pole 312A to pole 318A, (approx.600
linear ft.). A right of way must be established at 10 ft. away from
the 13,800 volt high voltage lines. Overhanging limbs must be removed
to a 10 ft. vertical line from the outer most conductor. Limbs will
range from 15" in diameter to finger size. The work will be
accomplished with high voltage lines energized and special precautions
will have to be taken. 3. PARTS AND SUPPLIES: All parts, components,
supplies material, fuel, oil, lubricants, and grease will be supplied
by the contractor at no additional expense to the government. 4.
CONTRACTOR PERSONNEL AND EQUIPMENT: Personnel should be qualified tree
trimmers to work around energized lines of 13,800 volts and be
familiar with ANSI Standard 133. The equipment should be rated and
certified for the voltage class when work is to be done near energized
lines. Vehicles and tools should be fiberglass insulated or equivalent
material. Personnel must be familiar with accident prevention and
safety requirements and procedures for high voltage work and tree
timing. 5. DISPOSAL OF MATERIALS: All debris, rubbish, and other
material resulting from removal operations and trimming operations
shall be disposed of by the contractor at a site outside the confines
of Offutt AFB and the Capehart Housing area. 6. EQUIPMENT ON GRASS
AREAS: Wheeled equipment will not be operated on grassed areas when
three is any possibility of causing damage by rutting. If rutting does
occur, the grass in the damaged area will be removed, soil leveled,
and the sod replaced, all at no cost to the Government. Damage to any
grassed areas will be repaired in a manner which will return it to its
original condition. This will be done regardless of the size of the
area. 7. WORKMANSHIP: a. Performance will include cleaning up any
debris or other matter that results from this work. The cleanup work
shall be accomplished bye the completion of each days work. The
contractor shall dispose of all debris off-site. b. The contractor or
site commander may remove any employee whose conduct, language, or
appearance is objectionable, or if so directed bye the contracting
officer. c. Damaged or destroyed Government property shall be replaced
by the contractor at his own expense. d. The contractor will furnish
sufficient sign and men to protect the vehicular traffic in the
vicinity of the work areas. e. The contractor is responsible for
temporarily removing any fences which are obstructing his work and for
putting them back in their original place as soon as the work is
accomplished. f. If the contractor finds it necessary to close a street
or streets for the removal of a tree, he must first notify the WAE so
that appropriate persons may be notified. Point of contract is 55 CES
Exterior Electric Shop (Mr. Carpenter/Tsgt. Moody, phone 294-4829.) g.
Point of contact is Randall D. Carney 402-294-3738. All requests must
be faxed in to 402-232-6571. No collect calls will be accepted. SIC
S2080. Performance time after award will be on or about 30 days. Award
will be on or about 22 Feb 99. Posted 01/22/99 (W-SN290616). (0022) Loren Data Corp. http://www.ld.com (SYN# 0093 19990126\S-0003.SOL)
S - Utilities and Housekeeping Services Index Page
|
|