COMMERCE BUSINESS DAILY ISSUE OF JANUARY 19,1999 PSA#2264US Army Corps of Engineers, Dist New Orleans, PO Box 60267, New
Orleans, LA 70160 Y -- MISSISSIPPI RIVER SHALLOW & DEEP DRAFT CROSSINGS, LEASED DUSTPAN
DREDGE SOL DACW29-99-R-0005 DUE 030299 POC Contract Specialist, Kelly
Gele', (504) 862-1515 For lease of one dustpan hydraulic pipeline
dredge, fully operated with attendant plant, to perform dredging
operations in the Mississippi River at designated locations, primarily
between Memphis, TN (MISS River Mile 735 AHP) and the Gulf of Mexico
(MISS River Mile 20 BHP). The dredge shall have a dustpan and water
agitation jet assembly attached to the suction pipe. The dustpan shall
be designed to function such that it can accommodate the dredge in
meeting or exceeding the specified dredging requirements. The dredge
shall not be less than 38 inches diameter discharge and not less than
3600 pump brake horsepower rating for continuous operation. The rate of
advance of the dredge, which is the forward movement of the dredge
while pumping materials, shall be the rate required to maintain the
minimum production rate. The discharge size will be considered to be
the minimum diameter of either the pump discharge or discharge line,
whichever is the lesser. The suction pipe shall have an intake section
of pipewith valve near the pump for the purpose of inserting dye in
the pump to determine the velocity. The dredge shall be capable of
starting work and working efficiently in 10' depth. The depth of
dredging generally ranges from 12' to 60'. The draft of the dredge
shall not exceed nine feet. The dredge shall be self-propelled for
moving under its own power upriver and downriver to dredging assignment
locations. The dredge shall have sufficient propulsion horsepower to
have a minimum sailing speed of 3 miles per hour (mph) upriver and 8
mph downriver in currents of up to 7 feet per second (fps) for moving
to commence dredging at a new location. The dredge shall be of such
design as to work efficiently and permit passage of other vessels while
working in a 300 to 500 foot wide channel. The dredge shall be
adequately powered and properly equipped for the pump size and
horsepower used. The minimum estimated drege output shall be 4800 cubic
yards per pumping hour. Attendant plant shall consist of (1) derrick
(self-propelled), (2) derrick barge ("A" frame), (3) floating pipeline
(1000 foot), (4) two tenders, (5) one workboat. Requests for proposals
will be available on 1 February 1999, please contact Kelly Gele' at
(504) 862-1515. Proposals are due on 2 March 1999. Posted 01/14/99
(W-SN288100). (0014) Loren Data Corp. http://www.ld.com (SYN# 0100 19990119\Y-0005.SOL)