COMMERCE BUSINESS DAILY ISSUE OF JANUARY 13,1999 PSA#2261Supply Department Indian Head Division, Naval Surface Warfare Center,
101 Strauss Ave, Indian Head, MD 20640-5035 46 -- REPLACE RUBBER LINING IN ANION UNIT SOL N00174-99-Q-0073 DUE
021299 POC Stanley N. Rye, Jr. -- (FAX)301-744-6567 WEB: Click here to
register in the Central Contractor Registration,
http://www.ccr.dlsc.dla.mil. E-MAIL: Click here to contact the
contracting officer via, StanRyeJr@mail.ih.navy.mil. ITEM NAME --
REPLACE RUBBER LINING IN THE NUMBER TWO ANION UNIT AT THE GODDARD POWER
PLANT // BIDDER QUALIFICATIONS -- BIDDERS MUST HAVE AT LEAST TEN YEARS
OF EXPERIENCE IN FIELD TANK RUBBER RELINING WORK. MUST PROVIDE
REFERENCES, INCLUDING CONTACT NAMES AND PHONE NUMBERS, FOR AT LEAST
FIVE SIMILAR RUBBER RELINING JOBS COMPLETED IN THE LAST ONE TO FIVE
YEARS. BIDDERS MUST ALSO BE REGISTERED WITH CCR(CENTRAL CONTRACTOR
REGISTRATION) // SCOPE OF WORK -- FURNISH ALL NECESSARY LABOR,
EQUIPMENT, AND MATERIAL TO: (1) REMOVE ALL RESIN AND ANTHRACITE FROM
ANION TANK. THE CONTRACTOR IS RESPONSIBLE FOR PROPER DISPOSAL OF ALL
WASTE MATERIALS GENERATED FROM THIS CONTRACT. THE ANION TANK CONTAINS
APPROXIMATELY 175 CUBIC FEET OF RESIN AND APPROXIMATELY 125 CUBIC FEET
OF ANTHRACITE COAL. THE TANK IS APPROXIMATELY 9 FT IN DIAMETER AND 13
FT IN HEIGHT. (2) CAREFULLY DISCONNECT AND REMOVE ALL EXTERIOR PIPING
CONNECTED TO THE ANION TANK. (3) CAREFULLY DISCONNECT, REMOVE, AND
INSPECT ALL INTERIOR PIPING. IF ANY OF THE PIPING SECTIONS SHOULD NEED
REPAIR, IT SHOULD BE IDENTIFIED AT THAT TIME. A DESCRIPTIVE LIST OF
THE PIPES NEEDING REPLACEMENT, AND THE PIPES THEMSELVES, SHOULD BE
SUPPLIED TO THE GOVERNMENT WITHIN 24 HOURS. THE GOVERNMENT WILL PROVIDE
THE REPLACEMENT PIPE PARTS. (4) COMPLETELY REMOVE RUBBER LINING FROM
ALL INTERNAL SURFACES AND FLANGE PADS. THE PREFERRED METHOD IS ULTRA
HIGH PRESSURE WATER BLASTING. (5) STEAM PURGE THE ENTIRE VESSEL AT 200
TO 212 DEGREES F FOR EIGHT HOURS. (6) SANDBLAST ENTIRE VESSEL INTERIOR
AND FLANGE PADS TO SSPC-SP5 WITH A MINIMUM PROFILE OF 2.5-3 MILS UP TO
FOUR OR FIVE MILS USING BLACK BEAUTY #1240 OR #1040. (7) APPLY
APPROPRIATE PRIMERS IMMEDIATELY AFTER SANDBLASTING. (8) RUBBER LINE
ENTIRE VESSEL AND FLANGE PADS WITH 3/16" THICK SEMI-HARD NATURAL
RUBBER(BLAIR VE926 OR POLYMERIC 1003) (9) STEAM CURE PER LINING
MANUFACTURER'S SPECIFICATIONS. (10) SPARK TEST ALL LINED SURFACES TO
ASSURE LINING INTEGRITY. LINER INTEGRITY, PARTS, AND LABOR ARE TO BE
WARRANTED FOR ONE YEAR. (11) PROPERLY INSTALL INTERNAL PIPING AND
RECONNECT EXTERNAL PIPING. (12) FLOW TEST ANION UNIT TO ENSURE PROPER
REINSTALLATION OF PIPING. (13) WORK IS TO BEGIN AFTER 99MAY15 AND BE
COMPLETED BEFORE 99JUL01. // REQUESTS FOR THIS SOLICITATION SHOULD BE
ADDRESSED TO STANLEY N. RYE, JR. VIA E-MAIL AT
StanRyeJr@mail.ih.navy.mil OR VIA FAX AT 301-744-6567. // SEE Note 1.
Posted 01/11/99 (W-SN286777). (0011) Loren Data Corp. http://www.ld.com (SYN# 0267 19990113\46-0001.SOL)