Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 15,1998 PSA#2242

USAFE Contracting Squadron/LGC, Unit 3115, APO AE 09094-3115

61 -- UNINTERRUPTIBLE POWER SUPPLY AND BATTERY SYSTEM SOL F61521-99QG230 DUE 011499 POC Anja Steil, Contract Buyer (011-49-631-3539-206) E-MAIL: UNINTERRUPTIBLE POWER SUPPLY AND BATTERY SYSTEM, ANJA.STEIL@RAMSTEIN.AF.MIL. UNINTERRUPTIBLE POWER SUPPLY SYSTEM,TO BE REMOVED, DISPOSED DELIVERED AND INSTALLED; VOLTAGE: IN AND OUTPUT: 380 VAC, 50 HZ; MAXIMUM DIMENSIONS: H=2000 MM, W=2000 MM, D=1000 MM; CONSISTING OF THE FOLLOWING COMPONENTS: 2 UNITS; RECTIFIER, MIN.6 PULSE, FOR EACH UNIT, INCLUDING A INPUT FILTER AND A DC FILTER FOR OUTPUT; INVERTER FOR EACH UNIT; STATIC BY-PASS FOR EACH UNIT, PARALLEL ELECTRONIC FOR EACH UNIT; REMOTE PANEL FOR EACH UNIT; INTERNAL MAINTENANCE BY-PASS INPUT FOR EACH UNIT; ENCLOSURE CABINET FOR EACH UNIT; WITH THE THE FOLLOWING REQUIREMENTS: SHALL HAVE CONTINUOS POWER TO LOAD WITHOUT INTERRUPTION; SHALL BE CONFIGURED TO SHARE THE LOAD EQUALLY;SHALL HAVE A MAX. CAPACITY OF 200 KVA; SHALL CONTAIN THE IGBT TECHNOLOGY; SHALL BE SHOCK PROOFED IN ACCORDANCE WITH THE SEISMIC ZONE 2A, BATTERY SYSTEM, TO BE REMOVED, DISPOSED, DELIVERED AND INSTALLED; MAX. DIMENSIONS: H=1500 MM, W=3000 MM, D=490 MM; CONSISTING OF: 2 SEPERATE BANKS; WITH A MIN. NEED OF 100 KVA FOR A 15 MINUTE BACK-UP TIME; WITH THE FOLLOWING REQUIREMENTS: SHALL BE CLOSED AND MAINTENANCE FREE; HAVE HAVE 10 YEAR LIFE TIME, VALVE REGULATED LEAD ACID TYPE; SHALL BE FLAME RETARDING; SHALL BE CHARGED; SHALL BE CONNECTED TO THE RESPECTIVE UPS SYSTEM; SHALL HAVE A LOADING TEST-CERTIFICATE, TO SHOW THAT EACH BATTERY IS PERFORMING PROPERLY; SHALL HAVE SCREWED AND SECURELY CONNECTED BATTERY POLES IN ACCORDANCE WITH THE BATTERY SYSTEM; WITH USER OPERATOR MANUAL AND ON SITE OPERATOR TRAINING, ENGLISH LANGUAGE, NOTE: THE CONTRACTOR SHALL NOT REMOVE THE EXISTING POWER SUPPLY AND BATTERY SYSTEM AT THE SAME TIME, WHEN THE NEW EQUIPMENT WILL BE DELIVERED AND INSTALLED. THE CONTRACTOR SHALL NOT REMOVE NOR DISPOSE THE EXISTING PLATE OF THE UPS AND BATTERY SYSTEM, BECAUSE THE NEW UNITS SHALL BE MOUNTED TO. FOR THE PHASE OF THE INSTALLATION, VENDORS ARE ALLOWED TO USE THE EXISTING CABLES, HOWEVER THE INPUT CIRCUIT BREAKERS MUST BE SIZED IN ACCORDANCE WITH THE DELIVERED UPS SYSTEM. IF THE DELIVERED CIRCUIT BREAKERS ARE LARGER THAN THE EXISTING FRAMES, THE FRAMES SHALL ALSO BE REPLACED IAW SINGLE LINE DIAGRAM. THE CONTRACTOR MUST PERFORM A SITE VISIT AT THE LOCATION PRIOR TO START OF PERFORMANCE, DELIVERY: FOB DESTINATION TO RAMSTEIN AIR BASE. REQUEST FOR QUOTATION WILL BE MADE AVAILABLE FROM THE USAFE CONTRACTING SQUADRON HOME PAGE: http://www.usafe.af.mil/joint/cons Posted 12/11/98 (W-SN279410). (0345)

Loren Data Corp. http://www.ld.com (SYN# 0256 19981215\61-0013.SOL)


61 - Electric Wire and Power and Distribution Equipment Index Page