|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 27,1998 PSA#2230USDA-Forest Service, Pacific Northwest Region, Okanogan National
Forest, 1240 S. Second Ave., Okanogan, WA 98840 Y -- WASHOUT REPAIR ON THE OKANOGAN NATIONAL FOREST SOL RFQ-R6-8-99-05
POC Rita M. Robson (509) 826-3392 East Fork Cougar Washout: This work
consists of the removal of culvert construction of a small dike,
constructing a riprap face on the dike and a headwall, placing sediment
traps in the stream, installation of pipe arch, the haul and placement
of borrow material and surfacng material. Spur Mtn. Washout: This
project will consist of the same type of work as the previous site. The
main difference is that fill material, riprap, crushed aggregate for
this project will be Government Furnished Material at the designated
locations. Estimated value of this soliitation is between $25,000 --
$100,000. This is an unrestricted solicitation. Posted 11/24/98
(W-SN274607). (0328) Loren Data Corp. http://www.ld.com (SYN# 0119 19981127\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|