|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 23,1998 PSA#2227U.S. Army Aviation and Missile Command, Acquisition Center, Bldg 4488,
Redstone Arsenal, AL 35898-5280 C -- ENGINEERING CHANGE PROPOSAL (ECP) EIG-98-AGPU-1 SOL
DAAH23-99-R-0063 POC Teresa Cosby, Contract Specialist, AMSAM-AC-SA-F,
(256) 876-4964, Contracting Officer, AMSAM-AC-SA-F, J.W. Sheats, (256)
876-7588 Contracting Officer AMSAM-AC-SA-F (ACC) Incorporation of ECP
EIG-98-AGPU-1 to reduce exhaust backpressure to increase available
shaft horsepower and increase AC capability from 37.5 Kva + 45 Kva for
(1) each Aviation Ground Power Unit (AGPU) SEE NUMBERED Note 22 Posted
11/19/98 (W-SN272914). (0323) Loren Data Corp. http://www.ld.com (SYN# 0015 19981123\C-0002.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|