|
COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 13,1998 PSA#2221Office of the Secretary of Defense, Pentagon Renovation Management
Office, 100 Boundary Channel Drive, Arlington, VA 22202 Y -- DESIGN/BUILD REMOTE DELIVERY FACILITY SOL MDA947-99-R-0003 POC
Billie Frye, Contracting Officer, 703-693-8954; Wendy Thompson, POC,
703-693-8954 WEB: Pentagon Renovation Office,
www.dtic.pentagon_renovation.mil. E-MAIL: Billie Frye, Contracting
Officer; Wendy Thompson,, fryebl@army.pentagon.mil;
thompsonw@army.pentagon.mil. Subject CBD notice is hereby amended to
clarify the requirements for the collocation of the power facility
through incorporation of the following contract options: Option 1: The
addition of up to approximately 50,000 gross square feet to
accommodate future location of power generation and cooling equipment.
Option 2: The design and construction of a physical plant to be
collocated with the Remote Delivery Facility to provide 20 megawatts
power generation, fuel supply, 4,000 tons of chiller and cooling tower
capacity, and primary distribution to the Pentagon. The estimated cost
of the base contract for the Remote Delivery Facility remains
unchanged, between $30,000,000 and $50,000,000. The estimated cost of
the overall project, inclusive of Options 1 or 2, is between
$50,000,000 and $80,000,000. The planned release date of the subject
solicitation has been changed to November 23, 1998. A Pre-proposal
Conference will be held on December 1, 1998 at 1:00 pm at the DLA
Headquarters Building, Ft. Belvoir, VA. Posted 11/10/98 (W-SN270478).
(0314) Loren Data Corp. http://www.ld.com (SYN# 0148 19981113\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|