Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 28,1998 PSA#2210

Oc-Alc/Dir Of Contracting, 3001 Staff Dr Ste 1ag76a, Tinker Air Force Base Ok 73145-3015

12 -- B-52 ELECTRO-OPT VIEWING SYS (EVS) SOL F34601-99-R-0019 DUE 010799 POC For copy, OC-ALC/PKXDA TINKER AFB OK 73145-3015, For additional information contact Rosemary Mcdonald/Ladcb/[405]739-5405 Electro-Optical Viewing System (EVS), Signal Data converter (SDC) -- a Line Replaceable Unit (LRU) for B052 Weapon System. Technical Description: The EVS, SDC LRU performs the function of the Servo Control Unit (SCU) Symbol signal Generator (SSG) and Video Distribution Unit (VDU). It mounts in the present SCU position. It is conduction cooled using compact heat exchangers and requires 220 Watts of power. The motherboard layout consists of 10 circuit card slots with 6 VME bussed slots and 4 general- purpose slots. It shall operate continuously at temperatures from -55C to 55C, with intermittent operation for up to 30 minutes at 71C. Note: Basically this is a first time requirement for the manufacturing of the Electro-Optical Viewing system from Government furnished data/drawings effort and will include a First Article Requirement. Contractor Requirements: The contractor must be able to meet the following requirements and shall have demonstrated the ability to: 1. Manufacture complex electronic devices from government furnished drawings and be able to commit to long term depot level repair support. 2. Perform qualification testing to include thermal, pressure altitude, humidity, vibration, shock and explosive conditions. 3. Fabricate complex wiring harness from government-furnished drawings. 4. Possess the ability to support the security requirements of the contract as applicable. 5. Maintain accountability of Government equipment assigned to the contract. 6. Have the capability to receive, repair and ship deliverables produced under contract as required. 7. Have capability to operate and maintain automated test systems. Specifically, the An/USM-623(v)1, B-52 modular Intermediate Depot Automatic Test Station (MIDATS) which will be government furnished equipment for testing of the completed SDC unit. After award, preliminary training in the operation of the test set may be available at Tinker AFB OK. 8. Have the capability to comply with ANSI/ASQC Q9002 or ISO 9002-1994. 9. Have the capabilities to convertgovernment furnished data furnished in different media formats. Media and formats are: schematics in Mentor Graphics 8.2 which are editable and on 4mm cartridge; PWB Layout in Mentor Graphics 8.2 Gerber which are non-editable and on 4mm cartridge; detail and assembly drawings in. dxf and. txt formats; and additional detail and assembly drawings in. pdf format which are on a CD and are not editable. Some changes, most of which are minor need to be incorporated into the drawings. Final delivery will be IGES and MIL-PRF- 28002, Type 4 (JEDMICS). (DI-DRPR-81000A) This will include one basic year and possible option years. Estimated qty for basic year is 77 each. The approximate issue/response date will be 01 DEC 1998. First article test required. No telephone requests. Only written or faxed requests received directly from the requestor are acceptable. All responsible sources solicited may submit a bid, proposal, or quotation which shall be considered. http://www.tinker-contracting.com/pkbizops/LAD/LADC/LADC.htm See Note (s) 1. Posted 10/26/98 (I-SN265432). (0299)

Loren Data Corp. http://www.ld.com (SYN# 0109 19981028\12-0001.SOL)


12 - Fire Control Equipment Index Page