COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 2,1998 PSA#2172U.S. Department of Labor, ETA, Division of Acquisition & Assistance,
200 Constitution Ave., NW, Room S-4203, Washington, DC 20210 Y -- PY '96 MISCELLANEOUS NEW CONSTRUCTION -- NEW EDUCATION BUILDING
AT THE MISSISSIPPI JOB CORPS CENTER SOL IFB-98-DAA-48-JC DUE 102298 POC
Mr. Geoffory Hartnett, (504) 412-2000 or Monica Gloster, Contract
Specialist, (202) 219-8706. WEB: IFB-98-DAA-48-JC,
http://cbdnet.access.gpo. E-MAIL: IFB-98-DAA-48-JC,
glosterm@doleta.gov. This work consists of the construction ofa 14,700
GSF New Multi-purpose Center and Education Building. The site work
includes underground utilities, grading, roads, sidewalks, etc. at the
Mississippi Job Corps in Crystal Springs, Mississippi. The period of
performance from NTP to substantial completion is 336 days (48 weeks).
The estimated cost range of construction is between $1,000,000 to
$5,000,000. Plans and specifications will be available on or about
September 17, 1998, ONLY from the Office of Billis Manning Architects,
605 Poydras Street, Suite 1250, New Orleans, LA 70130-6101. Contact:
Mr. Geoffory Hartnett at (504) 412-2000 for additional information
regarding this project. Collect calls will not be accepted. It is
emphasized that requests for plans and specifications shall be directed
to the A/E firm listed above to ensure proper handling of requests. All
requests must be in writing and a $100 bid deposit is required which is
refundable when plans and specifications are returned in good
condition. The bid deposit must be in the form of a Certified Check,
Cashier's Check or money order and made payable to the U.S. Department
of Labor, and submitted to Billes Manning Architects at the time of
request. All requests will be answered on a first-come, first-serve
basis until supplies are exhausted. For requests made after the supply
is exhausted, a non-refundable fee not to exceed the actual cost of
reproduction of the IFB documents (to be determined by the Contracting
Officer) plus a shipping charge based on individual requests (if
applicable) will be required in order to obtain the IFB documents. A
Pre-bid walk-thru is scheduled for October 8, 1998, at 10:00 a.m. local
time. Bid opening date is October 22, 1998 at 2:00 p.m. local time.
This is a 100% Small Business Set-Aside Acquisition. The Standard
Industrial Classification (SIC) Code for this acquisition is 1542 with
a Size Standard of $17.0 million. See Numbere Note(s): 1. Posted
08/31/98 (W-SN244089). (0243) Loren Data Corp. http://www.ld.com (SYN# 0125 19980902\Y-0003.SOL)
Y - Construction of Structures and Facilities Index Page
|
|