COMMERCE BUSINESS DAILY ISSUE OF AUGUST 18,1998 PSA#2161Fleet and Industrial Supply Center, Norfolk Washington Detachment 901
M.Street, S.E. Bldg. 200 4th Flr., Washington Navy Yard, Washington, DC
203 44 -- INDUCTION HEAT TREATING FURNACE SOL N00600-98-R-2624 DUE 082098
POC Lynn Christian, Code 02W1.2C, (202) 685-1281 E-MAIL:
fmso.navy.mil, Lynn_Christian@fmso.navy.mil. This amendment is being
issued to make clarifications to the original combined
synopsis/solicitation issued July 24, 1998 and to answer questions
raised at the pre-solicitation meeting held July 29, 1998 at Norfolk
Naval Shipyard. The requirement description is amended to include the
following: The radio frequency range required by Norfolk Naval Shipyard
is 300-450 kHz. FCC certification is required. It is the responsibility
of the vendor to insure that the unit provided is in FCC compliance.
The vendor is required to provide the documentation necessary to insure
the unit is in compliance. The work piece sizes, shapes, dimensions and
heat treatment specifications are as follows: Dia. Length Shape
Material Heat Treatment Specs 12" 6" Cylinder AISI 8620 Case harden to
Rockwell "C" 58-0.045 depth 7" 3" Hollow Cylinder AISI 8620 Case
harden to Rockwell "C" 58-0.045 depth 15 " 3" Hollow Cylinder
Mil-S-24093 Through harden to Gr 4340 140,000 PSI yield minimum Note:
The three entries in the above tableare the most common parts that will
be heat treated in the furnace. There are no requirements for factory
acceptance testing other than standard QA make, model, etc. After the
furnace is installed in the shipyard, acceptance tests shall be
prepared to prove hardening performance required in the above table.
The tests specimens and the mechanical testing will be provided and
conducted by Norfolk Naval Shipyard. Any alternate types of equipment
or modifications should be submitted separately. Any crane or forklift
service needed by the vendor to off load or position equipment
provided shall be supplied by the vendor. Cranes and crane service must
conform to Norfolk Naval Shipyard, local, state, and federal
requirements. There are no special requirements for forklifts. All
other terms of the RFP remain the same. The due date for offers remains
no later than 20 August 1998, 2:00 PM. Posted 08/14/98 (W-SN237300).
(0226) Loren Data Corp. http://www.ld.com (SYN# 0268 19980818\44-0001.SOL)
44 - Furnace, Steam Plant, Drying Equipment and Nuclear Reactors Index Page
|
|