Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF AUGUST 13,1998 PSA#2158

Arnold Engineering Development Center, Attn: AEDC PKP, 100 Kindel Drive, Suite A332, Arnold AFB TN 37389-1332

46 -- DESIGN & INSTALL A BROMINE COOLING WATER TREATMENT SYSTEM SOL F40650-98-R-0029 DUE 091898 POC Tony Clayborne, Contracting Officer, (931) 454-7841 This requirement is for the design and installation of a cooling water bromine treatment system. The work includes all labor, equipment, and materials required to design, deliver, off-load, remove existing systems, install, connect, test, train operators, and place a fully operational system in service. Also, the contractor will be required to provide protection over the cooling water bromine treatment system, provide a portable trailer-mounted bromine treatment system similar to the primary system, provide twelve months maintenance and repair support following system acceptance and provide a digital readout and display for remote monitoring of key system operating parameters. The contractor will be required to demonstrate a fully operational system before job acceptance. The performance period will be 120 calendar days after contractor receipt of notification of contract award. Any responsible source may submit a proposal which shall be considered. Firms responding to this synopsis should do so in writing and indicate whether they are a minority business concern. Foreign participation is authorized. Posted 08/11/98 (W-SN235715). (0223)

Loren Data Corp. http://www.ld.com (SYN# 0332 19980813\46-0001.SOL)


46 - Water Purification and Sewage Treatment Equipment Index Page