COMMERCE BUSINESS DAILY ISSUE OF AUGUST 13,1998 PSA#2158Arnold Engineering Development Center, Attn: AEDC PKP, 100 Kindel
Drive, Suite A332, Arnold AFB TN 37389-1332 46 -- DESIGN & INSTALL A BROMINE COOLING WATER TREATMENT SYSTEM SOL
F40650-98-R-0029 DUE 091898 POC Tony Clayborne, Contracting Officer,
(931) 454-7841 This requirement is for the design and installation of
a cooling water bromine treatment system. The work includes all labor,
equipment, and materials required to design, deliver, off-load, remove
existing systems, install, connect, test, train operators, and place a
fully operational system in service. Also, the contractor will be
required to provide protection over the cooling water bromine treatment
system, provide a portable trailer-mounted bromine treatment system
similar to the primary system, provide twelve months maintenance and
repair support following system acceptance and provide a digital
readout and display for remote monitoring of key system operating
parameters. The contractor will be required to demonstrate a fully
operational system before job acceptance. The performance period will
be 120 calendar days after contractor receipt of notification of
contract award. Any responsible source may submit a proposal which
shall be considered. Firms responding to this synopsis should do so in
writing and indicate whether they are a minority business concern.
Foreign participation is authorized. Posted 08/11/98 (W-SN235715).
(0223) Loren Data Corp. http://www.ld.com (SYN# 0332 19980813\46-0001.SOL)