COMMERCE BUSINESS DAILY ISSUE OF AUGUST 12,1998 PSA#2157US Postal Service, Facilities Service Office, PO Box 701, Columbia, MD
21045-0701 Z -- BATTERY ROOM EXPANSION -- WILMINGTON DE P&DC, 147 QUIGLEY BLVD,
WILMINGTON DE 19850-9998 SOL RFP# 232098-98-A-0111 DUE 090998 POC
Hekima Wallace, Facilities Contract Specialist (410) 997-6254 E-MAIL:
click here to contact issuing office, hwallac1@email.usps.gov. The
purpose of this project is to expand the existing battery room at the
Wilmington Processing & Distribution Center. ARCHITECTURAL Remove a 12"
concrete block wall, full height, separating the existing battery room
from the shop area. Remove the battery charging racks, 3-Impact doors
to the work room, roll-up steel door and personnel door to the loading
platform, and bridge crane. Install new battery charging racks, three
(3) pair or impact doors, one (1) personnel door, overhead bridge
crane, portable vehicle service lift, guardrail, bollards, and epoxy
paint masonry walls and concrete floor. Modify concrete floor to
accommodate new trench drain. Modify existing door and louver masonry
wall openings. MECHANICAL Remove existing exhaust systems in the
existing battery room and the adjacent maintenance shop room. Remove
wall louvers, plumbing fixtures, and a portion: of 3" underground waste
line. Provide new exhaust ventilation system in battery and vehicle
repair rooms, new in wall transfer grilles, new plumbing fixtures,
sanitary and vent lines, hot and cold water piping system: back flow
preventor, deionizing water system, trench drain, and
waste/neutralizing tank. Relocate unit heater and ductwork with reheat
coils. ELECTRICAL Disconnect and remove 120 VAC receptacles,
miscellaneous electrical power distribution equipment, and 277 VAC
lighting in the existing battery room and shop areas. Remove for
relocation purposes disconnect switches and starter. Relocate 112.5 kVA
transformer and 120/208 VAC panel board. Install new electrical
distribution panel board, transformer, feeder, receptacles, disconnect
switches, starters, and associated wiring and raceway to provide
electrical power for the battery chargers and their associated
equipment. Install new fluorescent lighting and associated electrical
power distribution branch circuits. Offeror must have a minimum of five
(5) years experience as a General contractor and must have
satisfactorily completed at least three (3) projects of similar size
and scope. A preproposal conference will not be held.The estimated
price range is between $225,000 and $350,000 with completion required
within 180 calendar days after receipt of the Notice to Proceed.
Solicitation packages will be available on or about August 10, 1998 at
$ 35.00 per set, NON-REFUNDABLE, from Attn: Herb Popp, Maida
Engineering, 550 Pinetown Rd Ste 400, Fort Washington PA 19034 (215)
542-8700 referencing 232098-98-A-0111. All checks/money orders must be
made payable to the US Postal Service, Disbursing Officer. Cash will
not be accepted. Offers are due September 9, 1998 at 4:00 pm. Any
planroom, within the project area, wishing to receive a package free of
charge, please fax or email a written request to H. Wallace (410)
997-6260 or hwallac1@email.usps.gov A list of planrooms and/or
planholders can be received by written request only via fax or email.
No phone requests for planholders list will be honored. OFFERS WILL NOT
BE PUBLICLY OPENED. The number of offers received, the identity of the
offerors, the amount of any offer, or relative standing of the offer
WILL NOT BE DISCLOSED TO ANYONE except those postal personnel whose
official duties require such information until award of contract is
made. THE POSTAL SERVICE RESERVES THE RIGHT TO REJECT ANY OR ALL
OFFERS. Posted 08/10/98 (W-SN235032). (0222) Loren Data Corp. http://www.ld.com (SYN# 0187 19980812\Z-0014.SOL)