|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 5,1998 PSA#2152Arnold Engineering Development Center, Attn: AEDC PKP, 100 Kindel
Drive, Suite A332, Arnold AFB TN 37389-1332 Y -- CONSTRUCTION OF SHEET PILING FOR RETENTION POND SOL
F406500-98-B-0024 DUE 091898 POC Tony Clayborne, Contracting Officer,
(931) 454-7841 This requirement is to install 220 linear feet of
interlocking sheet piling in an existing retention reservoir at water
depths from 0 to approximately 12 feet. The contractor will also be
required to modify the terminal pile (north end of the wall) to permit
tie-in of the existing boom/curtain installation. The piling material
shall be AZ-13 pile configuration, ASTM A690 steel or ASTM A6 steel
with the application of two 10 mil. coats of Sherwin-Williams
B69B40/B60V40 or equal cold tar epoxy enamel. The performance period
shall be 60 calendar days after issuance of notice to proceed. The
estimated magnitude is between $100,000 and $250,000. Any responsible
source may submit a bid which shall be considered. Firms responding to
this synopsis shall do so in writing and indicate whether they are a
minority business concern. Foreign participation is authorized. Posted
08/02/98 (W-SN231457). (0214) Loren Data Corp. http://www.ld.com (SYN# 0140 19980805\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|